A risk engineering approach to project risk management
暂无分享,去创建一个
[1] Van Slyke,et al. MONTE CARLO METHODS AND THE PERT PROBLEM , 1963 .
[2] Michael F. Driscoll. Instructional Uses of Approximate Convolutions and Their Graphs , 1980 .
[3] S Lichtenberg. Alternatives to conventional project management , 1983 .
[4] M. J. Page,et al. Management for Engineers , 1988 .
[5] Colin M. Sorrill. Risk Analysis for Large Projects: Models, Methods and Cases , 1987 .
[6] Richard M. Van Slyke,et al. Letter to the Editor---Monte Carlo Methods and the PERT Problem , 1963 .
[7] D F Cooper,et al. Selecting an approach to project time and cost planning , 1985 .
[8] S. Kaplan. On The Method of Discrete Probability Distributions in Risk and Reliability Calculations–Application to Seismic Risk Assessment , 1981 .
[9] Chris Chapman,et al. Problem-Solving Methodology Design on the Run , 1985 .
[10] Hon-Shiang Lau,et al. A Four-Moments Alternative to Simulation for a Class of Stochastic Management Models , 1982 .
[11] C. B. Chapman,et al. Large engineering project risk analysis , 1979, IEEE Transactions on Engineering Management.
[12] Dale F. Cooper,et al. Erratum: Model and Situation Specific O.R. Methods: Risk Engineering Reliability Analysis of an L.N.G. Facility , 1984 .
[13] Chris Chapman,et al. The development of computer software for risk analysis: a decision support system development case study , 1987 .