Interaction of Lean and Building Information Modeling in Construction
暂无分享,去创建一个
Robert Owen | Lauri Koskela | Rafael Sacks | Bhargav Dave | L. Koskela | R. Sacks | Bhargav Dave | R. Owen
[1] Lauri Koskela,et al. Information technology in construction: how to realise the benefits? , 2003 .
[2] Terry Winograd,et al. Focused Sharing of Information for Multidisciplinary Decision Making by Project Teams , 2001, J. Inf. Technol. Constr..
[3] Andrew Kusiak,et al. Manufacturing control with a push-pull approach , 1998 .
[4] Scott Gallagher,et al. The Toyota Way , 2005, IEEE Transactions on Engineering Management.
[5] Rafael Sacks,et al. Requirements for building information modeling based lean production management systems for construction , 2010 .
[6] B. Björk,et al. A SURVEY ON THE IMPACT OF INFORMATION TECHNOLOGY ON THE CANADIAN ARCHITECTURE , ENGINEERING AND CONSTRUCTION INDUSTRY , 2000 .
[7] Per Galle,et al. Towards integrated, “intelligent”, and compliant computer modeling of buildings , 1995 .
[8] Hugues Rivard. A Survey on the Impact of Information Technology in the Canadian Architecture, Engineering and Construction Industry , 2000, J. Inf. Technol. Constr..
[9] Lauri Koskela. Making-Do — the Eighth Category of Waste , 2004 .
[10] R. Jardim-Gonçalves. MULTI-CONSTRAINT INFORMATION MANAGEMENT AND VISUALISATION FOR COLLABORATIVE PLANNING AND CONTROL IN CONSTRUCTION , 2003 .
[11] Ghang Lee,et al. Parametric 3D modeling in building construction with examples from precast concrete , 2004 .
[12] John M. Kamara,et al. Capturing client requirements in construction projects , 2002 .
[13] Martin Fischer,et al. Case Study of the Implementation of the Lean Project Delivery System (LPDS) Using Virtual Building Technologies on a Large Healthcare Project , 2005 .
[14] Iris D. Tommelein,et al. Work Structuring to Achieve Integrated Product-Process Design , 2004 .
[15] A. R. Crathorne,et al. Economic Control of Quality of Manufactured Product. , 1933 .
[16] Kasun Hewage,et al. A novel solution for construction on-site communication – the information booth , 2009 .
[17] Martin Fischer,et al. Benefits and lessons learned of implementing building virtual design and construction (VDC) technologies for coordination of mechanical, electrical, and plumbing (MEP) systems on a large healthcare project , 2008, J. Inf. Technol. Constr..
[18] Lauri Koskela,et al. An exploration towards a production theory and its application to construction , 2000 .
[19] Frits Tolman,et al. Product modeling standards for the building and construction industry: past, present and future , 1999 .
[20] James P. Womack,et al. Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .
[21] Thomas Olofsson,et al. An evaluation model for ICT investments in construction projects , 2008, J. Inf. Technol. Constr..
[22] Rafael Sacks,et al. Lean Management Model for Construction of High-Rise Apartment Buildings , 2007 .
[23] Susan Leigh Star,et al. Institutional Ecology, `Translations' and Boundary Objects: Amateurs and Professionals in Berkeley's Museum of Vertebrate Zoology, 1907-39 , 1989 .
[24] John I. Messner,et al. Case studies in BIM implementation for programming of healthcare facilities , 2008, J. Inf. Technol. Constr..
[25] Richard Stevens,et al. Systems engineering : coping with complexity , 1998 .
[26] Genichi Taguchi,et al. Taguchi on Robust Technology Development , 1992 .
[27] Lauri Koskela,et al. Moving-on — beyond lean thinking , 2004 .
[28] Daniel Forgues,et al. Information technology as boundary object for transformational learning , 2009, J. Inf. Technol. Constr..
[29] Jennifer Whyte,et al. Virtual Reality and the Built Environment , 2003, Presence: Teleoperators & Virtual Environments.
[30] Lauri Koskela,et al. Application of the New Production Philosophy to Construction , 1992 .
[31] Charles M. Eastman,et al. Automatic rule-based checking of building designs , 2009 .
[32] Iris D. Tommelein,et al. Exploration of Set-Based Design for Reinforced Concrete Structures , 2007 .
[33] Lauri Koskela,et al. Improving Value Generation in the Design Process of Industrial Projects Using CAVT , 2006 .
[34] David Gann,et al. Building Innovation: Complex Constructs in a Changing World , 2000 .
[35] Matej Fischinger,et al. Object-oriented modeling of design system for RC buildings , 1994 .
[36] S. Fox. Evaluating potential investments in new technologies: Balancing assessments of potential benefits with assessments of potential disbenefits, reliability and utilization , 2008 .
[37] Rafael Sacks,et al. Impact of three-dimensional parametric modeling of buildings on productivity in structural engineering practice , 2008 .
[38] Weisheng Lu,et al. Optimizing construction planning schedules by virtual prototyping enabled resource analysis , 2009 .
[39] Heng Li,et al. A Qualitative Evaluation of Implementing Virtual Prototyping in Construction , 2009, 2009 Second International Conference in Visualisation.
[40] W. Edwards Deming,et al. Out of the Crisis , 1982 .
[41] Rob Howard,et al. Surveys of IT in the Construction Industry and Experience of the IT Barometer in Scandinavia , 1998, J. Inf. Technol. Constr..
[42] J. L. Stimpert. World Class Manufacturing: The Next Decade , 1997 .
[43] Rafael Sacks,et al. Visualization of Work Flow to Support Lean Construction , 2009 .