Engineers’ Perception of Contract Types’ Performance for Highway Construction Projects

This research focuses on the evaluation of a factor analysis of engineers’ perceptions of the performance of highway projects contract types’ (CTs’) against their respective selection criteria (SC) based on the results of a questionnaire survey. The SPSS database’s sample consisted of 91 engineers from Greece and abroad. Patterns of changes in engineers’ assessment of the CTs’ performance were noted and justified by comparing the factors’ content. Apart from the total sample, the analysis considered participants’ subgroups, such as Greek and foreign engineers, and experienced engineers in the private and public sector. Nationality and experience of participants influence the factors’ content. Moreover, a number of criteria tend to cluster together irrespective of CT and engineers’ profile. These pairs of criteria include all uncertainties’ criteria, Scope and Process Uncertainty, Contractual Difficulties and Claims, and finally Value for Money and Criticality of Schedule.

[1]  Konstantina Gkritza,et al.  Cost Savings Analysis of Performance-Based Contracts for Highway Maintenance Operations , 2010 .

[2]  Ivan Ka Wai Lai,et al.  Perception of various performance criteria by stakeholders in the construction sector in Hong Kong , 2010 .

[3]  James J. Jiang,et al.  The effects of change control and management review on software flexibility and project performance , 2008, Inf. Manag..

[4]  Chester G. Wilmot,et al.  Estimating future highway construction costs , 2003 .

[5]  Sidhartha S. Padhi,et al.  Centralized bid evaluation for awarding of construction projects – A case of India government , 2010 .

[6]  Sergios Lambropoulos The use of time and cost utility for construction contract award under European Union Legislation , 2007 .

[7]  A Jaafari Twinning Time and Cost in Incentive-Based Contracts , 1996 .

[8]  Wei Tong Chen,et al.  Setting maximum incentive for Incentive/Disincentive contracts for highway projects , 2004 .

[9]  Kamal M. Al‐Subhi Al‐Harbi Sharing fractions in cost-plus-incentive-fee contracts , 1998 .

[10]  David Arditi,et al.  Incentive/Disincentive Contracts: Perceptions of Owners and Contractors , 1998 .

[11]  T. Berends Cost plus incentive fee contracting - experiences and structuring , 2000 .

[12]  Wei-Chih Wang,et al.  Unit-price-based model for evaluating competitive bids , 2006 .

[13]  J in 't Veld,et al.  Keeping large projects under control: the importance of contract type selection , 1989 .

[14]  S. Thomas Ng,et al.  Contractor selection criteria: a cost-benefit analysis , 2001, IEEE Trans. Engineering Management.

[15]  Trefor P. Williams Predicting final cost for competitively bid construction projects using regression models , 2003 .

[16]  Georgios N. Aretoulis,et al.  Selection Criteria Used for the Choice of Contract Type for Major Highway Construction Projects , 2012 .

[17]  Samuel Labi,et al.  Planning-stage estimation of highway project duration on the basis of anticipated project cost, project type, and contract type , 2011 .

[18]  Ralph W. Plummer,et al.  Incentive/disincentive guidelines for highway construction contracts , 1995 .

[19]  Koichi Ono Health and safety in shotcreting , 1996 .

[20]  Ludovic-Alexandre Vidal,et al.  Measuring project complexity using the Analytic Hierarchy Process , 2011 .

[21]  J. Turner,et al.  Erim Report Series Research in Management Project Contract Management and a Theory of Organization Bibliographic Data and Classifications , 2022 .

[22]  Denise Bower,et al.  INCENTIVE MECHANISMS FOR PROJECT SUCCESS , 2002 .

[23]  Colin Duffield,et al.  Incentives in the Chinese construction industry , 2008 .

[24]  Xianhai Meng,et al.  The impact of incentive mechanisms on project performance , 2012 .

[25]  John F. Y. Yeung,et al.  Risk ranking and analysis in target cost contracts: Empirical evidence from the construction industry , 2011 .

[26]  Li Liu,et al.  Achieving ambidexterity in large, complex engineering projects: a case study of the Sutong Bridge project , 2012 .

[27]  Robert E. McCormick,et al.  ECONOMIC PRINCIPLES OF CONTRACTOR COMPENSATION , 1997 .

[28]  Quality incentives in auctions for construction contracts , 1994 .

[29]  Demos C. Angelides,et al.  A prototype system for the prediction of final cost in construction projects , 2006, Oper. Res..

[30]  Søren L. Buhl,et al.  Underestimating Costs in Public Works Projects: Error or Lie? , 2002, 1303.6604.

[31]  Said Boukendour,et al.  The guaranteed maximum price contract as call option , 2001 .

[32]  K. Manley,et al.  Motivation toward financial incentive goals on construction projects , 2011 .

[33]  David Baccarini,et al.  The concept of project complexity—a review , 1996 .

[34]  Hemanta Doloi,et al.  Understanding stakeholders' perspective of cost estimation in project management , 2011 .

[35]  Omotayo Olugbenga Aina,et al.  A comparative analysis of the performance of traditional contracting and design-build procurements on client objectives in Nigeria , 2011 .

[36]  Alexander Verbraeck,et al.  Grasping project complexity in large engineering projects: The TOE (Technical, Organizational and Environmental) framework , 2011 .

[37]  Paul M. Goodrum,et al.  A decision‐making system for accelerating roadway construction , 2009 .

[38]  Sai On Cheung,et al.  The aggressive–cooperative drivers of construction contracting , 2009 .

[39]  Ulrika Badenfelt Fixing the contract after the contract is fixed: a study of incomplete contracts in IT and construction projects , 2011 .

[40]  Zohar J. Herbsman,et al.  LANE RENTAL--INNOVATIVE WAY TO REDUCE ROAD CONSTRUCTION TIME , 1998 .

[41]  Choosing contractor payment terms , 1994 .

[42]  Jan Bröchner,et al.  Changes and change management in construction and IT projects , 2011 .

[43]  Wei Tong Chen,et al.  A method to determine minimum contract bids for incentive highway projects , 2003 .

[44]  David Arditi,et al.  Incentive/Disincentive Provisions in Highway Contracts , 1997 .

[45]  Kyle J. Mayer,et al.  Learning to Contract: Evidence from the Personal Computer Industry , 2004, Organ. Sci..

[46]  Anand Paul,et al.  Simple probability models for project contracting , 2005, Eur. J. Oper. Res..