Quality analysis in flexible manufacturing systems with batch productions

In this paper, we present an analytical method to evaluate the quality performance of flexible manufacturing systems with batch operations. Many flexible manufacturing systems implement batch production to shorten changeover time, reduce cost, and improve quality. In such systems, different types of products are process in batches where all products in each batch have the same type. The change of product type only occurs after the last job in a batch is processed. A closed formula to quantify the probability of producing a good part is derived and structural properties to address the appropriate sequence of products are presented.

[1]  Rajan Suri,et al.  An overview of evaluative models for flexible manufacturing systems , 1985 .

[2]  新郷 重夫,et al.  Zero quality control : source inspection and the poka-yoke system , 1986 .

[3]  J. A. Buzacott,et al.  Flexible manufacturing systems: a review of analytical models , 1986 .

[4]  Young K. Son,et al.  Economic measure of productivity, quality and flexibility in advanced manufacturing systems , 1987 .

[5]  Yash P. Gupta,et al.  Flexibility of manufacturing systems: Concepts and measurements , 1989 .

[6]  J.-T. Lim,et al.  Homogeneous, asymptotically reliable serial production lines: theory and case study , 1989, Proceedings. ICCON IEEE International Conference on Control and Applications.

[7]  Candace Arai Yano,et al.  Procedures to analyze the tradeoffs between costs of setup and utility work for automobile assembly lines , 1989 .

[8]  Suresh P. Sethi,et al.  Flexibility in manufacturing: A survey , 1990 .

[9]  E. Adam,et al.  The impact of flexible manufacturing systems on productivity and quality , 1991 .

[10]  Pascal Van Hentenryck,et al.  A Generic Arc-Consistency Algorithm and its Specializations , 1992, Artif. Intell..

[11]  Tibor Kolta Selecting Equipment to Control Air Pollution from Automotive Painting Operations , 1992 .

[12]  John A. Buzacott,et al.  Stochastic models of manufacturing systems , 1993 .

[13]  Heinrich Kuhn,et al.  Flexible Manufacturing Systems: Decision Support for Design and Operation , 1993 .

[14]  R. A. Nallicheri Automotive painting--an economic and strategic analysis , 1994 .

[15]  T. C. Powell Total Quality Management as Competitive Advantage , 1995 .

[16]  Christian Davis,et al.  PAINT SPRAY BOOTH CLEANING PRACTICES IN THE AUTOMOTIVE INDUSTRY , 1995 .

[17]  Jong-Tae Lim,et al.  Bottlenecks in serial production lines: A system-theoretic approach , 1996 .

[18]  Shimon Y. Nof,et al.  CIM flexibility measures: A review and a framework for analysis and applicability assessment , 1997 .

[19]  Semyon M. Meerkov,et al.  Bottlenecks in Markovian production lines: a systems approach , 1998, IEEE Trans. Robotics Autom..

[20]  Stefano Tonchia,et al.  Manufacturing flexibility: A literature review , 1998 .

[21]  MengChu Zhou,et al.  Modeling, Simulation, and Control of Flexible Manufacturing Systems - A Petri Net Approach , 1999, Series in Intelligent Control and Intelligent Automation.

[22]  L. Shi,et al.  Performance Modeling of Automated Manufacturing Systems, N. Viswanadham and Y. Narahari, Prentice‐Hall, Englewood Cliffs, U.S.A., 1992. Price: £45.95. ISBN 0‐13‐658824‐7, xvi+592pp. , 1999 .

[23]  Takahashi Shinichi,et al.  Recent Approaches for Saving Energy in Automotive Painting , 1999 .

[24]  A. J. Morris,et al.  Manufacturing performance enhancement through multivariate statistical process control , 1999 .

[25]  Pascal Van Hentenryck The OPL optimization programming language , 1999 .

[26]  Semyon M. Meerkov,et al.  c-bottlenecks in serial production lines: identification and application , 1999, Proceedings of the 38th IEEE Conference on Decision and Control (Cat. No.99CH36304).

[27]  Jong-Tae Lim,et al.  Improvability of assembly systems II: Improvability indicators and case study , 2000 .

[28]  Derrick E. D'Souza,et al.  Toward a taxonomy of manufacturing flexibility dimensions , 2000 .

[29]  Semyon M. Meerkov,et al.  Bottlenecks with respect to due-time performance in pull serial production lines , 2000, Proceedings 2000 ICRA. Millennium Conference. IEEE International Conference on Robotics and Automation. Symposia Proceedings (Cat. No.00CH37065).

[30]  Vikram Cariapa,et al.  A fixture repeatability and reproducibility measure to predict the quality of machined parts , 2000 .

[31]  John A. Sharp,et al.  A review of manufacturing flexibility , 2000, Eur. J. Oper. Res..

[32]  Jens Bengtsson,et al.  Manufacturing flexibility and real options: A review , 2001 .

[33]  Alf Kimms,et al.  Sequencing JIT Mixed-Model Assembly Lines Under Station-Load and Part-Usage Constraints , 2001, Manag. Sci..

[34]  Amrik S. Sohal,et al.  TQM and innovation: a literature review and research framework , 2001 .

[35]  Giovani J.C. da Silveira,et al.  Mass customization: Literature review and research directions , 2001 .

[36]  Stella Papasavva,et al.  Characterization of automotive paints: an environmental impact analysis , 2001 .

[37]  C. Voss,et al.  Quality management re-visited: a reflective review and agenda for future research , 2002 .

[38]  Ming-Lu Wu,et al.  Quality function deployment: A literature review , 2002, Eur. J. Oper. Res..

[39]  Dailun Shi,et al.  A survey of manufacturing flexibility: Implications for e-business flexibility , 2003, IBM Syst. J..

[40]  Saif Benjaafar,et al.  Resequencing and feature assignment on an automated assembly line , 2003, IEEE Trans. Robotics Autom..

[41]  Christine Solnon,et al.  A Study of Greedy, Local Search, and Ant Colony Optimization Approaches for Car Sequencing Problems , 2003, EvoWorkshops.

[42]  Dennis E. Blumenfeld,et al.  Designing production systems for quality: Research opportunities from an automotive industry perspective , 2003 .

[43]  Waldo C. Kabat,et al.  Job-shop scheduling using automated reasoning: A case study of the car-sequencing problem , 2004, Journal of Automated Reasoning.

[44]  Tamás Kis,et al.  On the complexity of the car sequencing problem , 2004, Oper. Res. Lett..

[45]  D. Shonnard,et al.  Assessment of the Automobile Assembly Paint Process for Energy, Environmental, and Economic Improvement , 2004 .

[46]  Jingshan Li,et al.  Throughput analysis in automotive paint shops: a case study , 2004, IEEE Transactions on Automation Science and Engineering.

[47]  Sven Spieckermann,et al.  A sequential ordering problem in automotive paint shops , 2004 .

[48]  N. van Hop *,et al.  Fuzzy estimation for manufacturing flexibility , 2005 .

[49]  Cem Canel,et al.  An algorithm for scheduling batches of parts in a multi-cell flexible manufacturing system , 2005 .

[50]  Thomas Lager,et al.  The industrial usability of quality function deployment: a literature review and synthesis on a meta‐level , 2005 .

[51]  S. R. Devadasan,et al.  Theory and practice of total quality function deployment , 2006 .

[52]  Marc Gravel,et al.  Solving real car sequencing problems with ant colony optimization , 2006, Eur. J. Oper. Res..

[53]  Theodore T. Allen,et al.  Six Sigma Literature: A Review and Agenda for Future Research , 2006, Qual. Reliab. Eng. Int..

[54]  Saif Benjaafar,et al.  Sequencing with limited flexibility , 2007 .

[55]  Ningjian Huang,et al.  Quality Evaluation in Flexible Manufacturing Systems: A Markovian Approach , 2007 .

[56]  Jingshan Li,et al.  Manufacturing System Design to Improve Quality Buy Rate: An Automotive Paint Shop Application Study , 2007, IEEE Transactions on Automation Science and Engineering.

[57]  Jayashankar M. Swaminathan,et al.  Managing Product Variety in Automobile Assembly: The Importance of the Sequencing Point , 2007, Interfaces.

[58]  Daniel Quadt,et al.  Batch scheduling of jobs with identical process times on flexible flow lines , 2007 .

[59]  Fred Spiring,et al.  Introduction to Statistical Quality Control , 2007, Technometrics.

[60]  Semyon M. Meerkov,et al.  Assembly systems with non-exponential machines: Throughput and bottlenecks , 2008 .

[61]  Dennis E. Blumenfeld,et al.  Production system design for quality robustness , 2008 .

[62]  Matthias Prandtstetter,et al.  An integer linear programming approach and a hybrid variable neighborhood search for the car sequencing problem , 2008, Eur. J. Oper. Res..

[63]  A. M. Rawani,et al.  Quality function deployment: a comprehensive literature review , 2008, Int. J. Data Anal. Tech. Strateg..

[64]  Fugee Tsung,et al.  Statistical process control for multistage manufacturing and service operations: A review and some extensions , 2008 .

[65]  Ernst Worrell,et al.  Energy Efficiency Improvement and Cost Saving Opportunities for the Vehicle Assembly Industry , 2008 .

[66]  Stephan Biller,et al.  Bottlenecks in Production Lines with Rework: A Systems Approach , 2008 .

[67]  Sandra Rothenberg,et al.  ENVIRONMENTAL PERFORMANCE AS A DRIVER OF SUPERIOR QUALITY , 2003 .

[68]  Jianjun Shi,et al.  Quality control and improvement for multistage systems: A survey , 2009 .

[69]  Jingshan Li,et al.  Modeling and analysis of the emergency department at University of Kentucky Chandler Hospital using simulations. , 2010, Journal of emergency nursing: JEN : official publication of the Emergency Department Nurses Association.

[70]  Stephan Biller,et al.  Quality Analysis in Flexible Manufacturing Systems With Batch Productions: Performance Evaluation and Nonmonotonic Properties , 2008, IEEE Transactions on Automation Science and Engineering.

[71]  Yao Hu,et al.  Transient analysis to design buffer capacity in dairy filling and packing production lines , 2010 .

[72]  Stephan Biller,et al.  Quality/Quantity Improvement in an Automotive Paint Shop: A Case Study , 2010, IEEE Transactions on Automation Science and Engineering.

[73]  Stephan Biller,et al.  Product Sequencing With Respect to Quality in Flexible Manufacturing Systems With Batch Operations , 2010, IEEE Transactions on Automation Science and Engineering.