The performance of push and pull systems: a simulation and comparative study
暂无分享,去创建一个
[1] P. C. Pandey,et al. The performance analysis of unbalanced automatic transfer lines , 1983 .
[2] R. Schonberger. Japanese Manufacturing Techniques , 1982 .
[3] Gabriel R. Bitran,et al. A mathematical programming approach to a deterministic Kanban system , 1987 .
[4] Y. Monden. Toyota Production System: Practical Approach to Production Management , 1983 .
[5] Bhaba R. Sarker. Simulating a just-in-time production system , 1989 .
[6] J. A. Buzacott,et al. Models of automatic transfer lines with inventory banks a review and comparison , 1978 .
[7] Norman A. Dudley,et al. WORK-TIME DISTRIBUTIONS , 1963 .
[8] Gordon C. Hunt,et al. Sequential Arrays of Waiting Lines , 1956 .
[9] Osamu Kimura,et al. Desiǵn and analysis of Pull System, a method of multi-staǵe production control , 1981 .
[10] Loren Paul Rees,et al. An investigation of the factors influencing the number of Kanbans required in the implementation of the JIT technique with Kanbans , 1987 .
[11] Loren Paul Rees,et al. Dynamically Adjusting the Number of Kanbans in a Just-in-Time Production System Using Estimated Values of Leadtime , 1987 .
[12] Frederick S. Hillier,et al. Finite Queues in Series with Exponential or Erlang Service Times - A Numerical Approach , 1966, Oper. Res..
[13] J. Buzacott. PREDICTION OF THE EFFICIENCY OF PRODUCTION SYSTEMS WITHOUT INTERNAL STORAGE , 1967 .
[14] Colin L. Moodie,et al. OPTIMAL BUFFER STORAGE CAPACITY IN PRODUCTION , 1968 .
[15] Y A Hosni,et al. Line Of Balance (Lob) Using A Microcomputer , 1981 .
[16] A. D. Knott,et al. THE INEFFICIENCY OF A SERIES OF WORK STATIONS—A SIMPLE FORMULA , 1970 .
[17] S. Panwalkar,et al. A Predictive Equation for Average Output of K Stage Series Systems with Finite Interstage Queues , 1979 .
[18] Lee J. Krajewski,et al. Kanban, MRP, and Shaping the Manufacturing Environment , 1987 .
[19] N. P. Rao,et al. A viable alternative to the ‘method of stages’ solution of series production systems with Erlang service times , 1976 .
[20] C. G. Drury,et al. THE DEPENDENCE OF THE COEFFICIENT OF VARIATION OF A WORK-TIME DISTRIBUTION ON THE NUMBER OF ELEMENTS IN THE WORK TASK , 1968 .
[21] G. G. Hitchings,et al. The effects of performance time variance on a balanced, four-station manual assembly line , 1973 .
[22] A. Alan B. Pritsker,et al. Introduction to simulation and SLAM II , 1979 .
[23] Bhaba R. Sarker,et al. The effect of imbalance in a just-in-time production system: a simulation study , 1988 .
[24] Averill M. Law,et al. Simulation Modeling and Analysis , 1982 .
[25] William C. Perkins,et al. Stochastic unpaced line design: Review and further experimental results , 1985 .
[26] Kut C. So,et al. Allocating buffer storages in a pull system , 1988 .
[27] Michael J. Magazine,et al. Heuristics for determining output and work allocations in series flow lines , 1978 .
[28] Richard J. Schonberger. Applications of Single-Card and Dual-Card Kanban , 1983 .
[29] Bhaba R. Sarker. Some Comparative and Design Aspects of Series Production Systems , 1984 .
[30] Geoff Buxey,et al. Simulation studies of conveyor-paced assembly lines with buffer capacity , 1976 .
[31] Y. Sugimori,et al. Toyota production system and Kanban system Materialization of just-in-time and respect-for-human system , 1977 .
[32] Loren Paul Rees,et al. A SIMULATION ANALYSIS OF THE JAPANESE JUST‐IN‐TIME TECHNIQUE (WITH KANBANS) FOR A MULTILINE, MULTISTAGE PRODUCTION SYSTEM , 1983 .