Approximability of flow shop scheduling
暂无分享,去创建一个
[1] Bruce M. Maggs,et al. Packet routing and job-shop scheduling inO(congestion+dilation) steps , 1994, Comb..
[2] David B. Shmoys,et al. Near-Optimal Sequencing with Precedence Constraints , 1990, IPCO.
[3] Jan Karel Lenstra,et al. Approximation algorithms for scheduling unrelated parallel machines , 1987, 28th Annual Symposium on Foundations of Computer Science (sfcs 1987).
[4] Pravin M. Vaidya,et al. Speeding-up linear programming using fast matrix multiplication , 1989, 30th Annual Symposium on Foundations of Computer Science.
[5] Éva Tardos,et al. Fast Approximation Algorithms for Fractional Packing and Covering Problems , 1995, Math. Oper. Res..
[6] S. Sevast’yanov. Bounding algorithm for the routing problem with arbitrary paths and alternative servers , 1986 .
[7] H. Mine,et al. PERFORMANCE ANALYSIS OF SIX APPROXIMATION ALGORITHMS FOR THE ONE-MACHINE MAXIMUM LATENESS SCHEDULING PROBLEM WITH READY TIMES , 1979 .
[8] Jan Karel Lenstra,et al. Complexity of machine scheduling problems , 1975 .
[9] Aravind Srinivasan,et al. Chernoff-Hoeffding bounds for applications with limited independence , 1995, SODA '93.
[10] David B. Shmoys,et al. Approximation schemes for constrained scheduling problems , 1989, 30th Annual Symposium on Foundations of Computer Science.
[11] David B. Shmoys,et al. Improved approximation algorithms for shop scheduling problems , 1991, SODA '91.
[12] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[13] Michael R. Fellows,et al. FIXED-PARAMETER TRACTABILITY AND COMPLETENESS , 2022 .
[14] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[15] David B. Shmoys,et al. Jackson's Rule for Single-Machine Scheduling: Making a Good Heuristic Better , 1992, Math. Oper. Res..
[16] Eugene L. Lawler,et al. Sequencing and scheduling: algorithms and complexity , 1989 .
[17] C. N. Potts,et al. Analysis of a linear programming heuristic for scheduling unrelated parallel machines , 1985, Discret. Appl. Math..
[18] Bruce M. Maggs,et al. Fast Algorithms for Finding O(Congestion + Dilation) Packet Routing Schedules , 1995, Proceedings of the Twenty-Eighth Annual Hawaii International Conference on System Sciences.
[19] Eugene L. Lawler,et al. Chapter 9 Sequencing and scheduling: Algorithms and complexity , 1993, Logistics of Production and Inventory.
[20] Michael T. Hallett,et al. The Parameterized Complexity of Some Problems in Logic and Linguistics , 1994, LFCS.
[21] Clifford Stein,et al. Approximation algorithms for multicommodity flow and shop scheduling problems , 1992 .
[22] Gerhard J. Woeginger,et al. Makespan minimization in open shops: A polynomial time approximation scheme , 1998, Math. Program..
[23] Han Hoogeveen,et al. Short Shop Schedules , 1997, Oper. Res..
[24] Teofilo F. Gonzalez,et al. Open Shop Scheduling to Minimize Finish Time , 1976, JACM.
[25] Ravi Sethi,et al. The Complexity of Flowshop and Jobshop Scheduling , 1976, Math. Oper. Res..