A social-behavioural approach to project work under uncertainty

Abstract Engineering responsiveness is prerequisite to organisational success in dynamically changing engineer-to-order projects, such as specialised vessel construction. Creating flexibility by solving the true project planning complexity is difficult due to the involved uncertainties and dynamics, and classical models lack the flexibility necessary to adequately handle uncertainty. Model-based approaches are, therefore, frequently replaced by informal team processes and judgmental decision making, often demonstrating innovative solutions not visible within traditional approaches. We suggest that the core practice in handling uncertainty in technologically complex large projects is neither imposed by established hierarchies nor model-based decision support, but evolves from the lower level social-behavioural structures, and extend the scope of research to include behavioural characteristics in social networks of project work. We demonstrate a way to study and better align the social capital to enable project responsiveness; by e.g. identifying symptoms of dysfunctional information transfer, and key influencers which will make a change project successful. The main purpose is to gain familiarity with the social phenomena involved, in order to formulate a more precise problem.

[1]  Raimo P. Hämäläinen,et al.  On the importance of behavioral operational research: The case of understanding and communicating about dynamic systems , 2013, Eur. J. Oper. Res..

[2]  M. Lobo,et al.  Competent jerks, lovable fools, and the formation of social networks. , 2005, Harvard business review.

[3]  John E. Hunter,et al.  Tacit Knowledge, Practical Intelligence, General Mental Ability, and Job Knowledge , 1993 .

[4]  Gary P. Pisano,et al.  Toward a Theory of Behavioral Operations , 2008, Manuf. Serv. Oper. Manag..

[5]  D. Krackhardt The strength of strong ties: The importance of Philos in organizations , 2003 .

[6]  Michal Kaut,et al.  A Mockup Stochastic Program to Study the Impact of Design Uncertainty on ETO Shipbuilding Planning , 2015, APMS.

[7]  Ronald S. Burt,et al.  A note on sociometric order in the general social survey network data , 1986 .

[8]  Jan Emblemsvåg,et al.  Lean Project Planning in Shipbuilding , 2014 .

[9]  Kathleen M. Carley,et al.  Cognitive inconsistencies and non-symmetric friendship , 1996 .

[10]  Edward J. Jaselskis,et al.  Optimal Allocation of Project Management Resources for Achieving Success , 1991 .

[11]  K. Sengupta,et al.  Alternative conceptions of feedback in dynamic decision environments: an experimental investigation , 1993 .

[12]  Kenneth L. Schultz,et al.  Bodies of Knowledge for Research in Behavioral Operations , 2009 .

[13]  Hajnalka Vaagen,et al.  A Multidisciplinary Framework for Robust Planning and Decision-Making in Dynamically Changing Engineering Construction Projects , 2014, APMS.

[14]  James Nebus,et al.  Building Collegial Information Networks: A Theory of Advice Network Generation , 2006 .

[15]  S. Ghoshal,et al.  Social Capital and Value Creation: The Role of Intrafirm Networks , 1998 .

[16]  Mark S. Granovetter The Strength of Weak Ties , 1973, American Journal of Sociology.

[17]  P. V. Marsden,et al.  NETWORK DATA AND MEASUREMENT , 1990 .

[18]  John R. Schuyler,et al.  Risk and Decision Analysis in Projects , 2001 .

[19]  van Wouter Wezel,et al.  Coordination activities of human planners during rescheduling: case analysis and event handling procedure , 2011 .

[20]  C. Loch,et al.  Social preferences and emotions as regulators of behavior in processes , 2013 .

[21]  Elliot Bendoly,et al.  Bipolarity in reactions to operational ‘constraints’: OM bugs under an OB lens , 2007 .

[22]  Paul Chinowsky,et al.  Social Network Model of Construction , 2008 .

[23]  K. McConway,et al.  Decision Theory: An Introduction to the Mathematics of Rationality , 1986 .

[24]  Elliot Bendoly,et al.  Behavior in operations management: Assessing recent findings and revisiting old assumptions , 2006 .

[25]  Stein W. Wallace,et al.  Improving project cost estimation by taking into account managerial flexibility , 2000, Eur. J. Oper. Res..

[26]  Keith Goffin,et al.  Tacit Knowledge, Lessons Learnt, and New Product Development , 2011 .