Rescheduling flowshops under simultaneous disruptions
暂无分享,去创建一个
[1] A. G. Lockett,et al. Job shop scheduling heuristics and frequency of scheduling , 1982 .
[2] Reha Uzsoy,et al. Analysis of periodic and event-driven rescheduling policies in dynamic shops , 1992 .
[3] Chandrasekharan Rajendran,et al. Scheduling in flowshops to minimize total tardiness of jobs , 2004 .
[4] Éric D. Taillard,et al. Benchmarks for basic scheduling problems , 1993 .
[5] Mostafa Zandieh,et al. An immune algorithm for scheduling a hybrid flow shop with sequence-dependent setup times and machines with random breakdowns , 2009 .
[6] William G. Ferrell,et al. Dynamic rescheduling that simultaneously considers efficiency and stability , 2004, Comput. Ind. Eng..
[7] Amritpal Singh Raheja,et al. Reactive repair tool for job shop schedules , 2005 .
[8] Antonio Grieco,et al. An online approach to dynamic rescheduling for production planning applications , 2008 .
[9] Sanja Petrovic,et al. SURVEY OF DYNAMIC SCHEDULING IN MANUFACTURING SYSTEMS , 2006 .
[10] Chris N. Potts,et al. Rescheduling for New Orders , 2004, Oper. Res..
[11] Donya Rahmani,et al. Robust and stable flow shop scheduling with unexpected arrivals of new jobs and uncertain processing times , 2014 .
[12] M Özlen,et al. Rescheduling unrelated parallel machines with total flow time and total disruption cost criteria , 2011, J. Oper. Res. Soc..
[13] Ghaith Rabadi,et al. Rescheduling of unrelated parallel machines under machine breakdowns , 2008 .
[14] Jeffrey W. Herrmann,et al. Rescheduling Manufacturing Systems: A Framework of Strategies, Policies, and Methods , 2003, J. Sched..
[15] James C. Bean,et al. Matchup Scheduling with Multiple Resources, Release Dates and Disruptions , 1991, Oper. Res..
[16] Rubén Ruiz,et al. Flow shop rescheduling under different types of disruption , 2013 .
[17] Sanjay Mehta,et al. Predictable scheduling of a single machine subject to breakdowns , 1999, Int. J. Comput. Integr. Manuf..
[18] Reha Uzsoy,et al. Executing production schedules in the face of uncertainties: A review and some future directions , 2005, Eur. J. Oper. Res..
[19] Xiangtong Qi,et al. Disruption management for machine scheduling: The case of SPT schedules , 2006 .
[20] Rubén Ruiz,et al. Minimising total tardiness in the m-machine flowshop problem: A review and evaluation of heuristics and metaheuristics , 2008, Comput. Oper. Res..
[21] F. Robert Jacobs,et al. Manufacturing Planning and Control for Supply Chain Management, 6/E. , 2016 .
[22] Botond Kádár,et al. Stability-oriented evaluation of rescheduling strategies, by using simulation , 2007, Comput. Ind..
[23] Ali Allahverdi,et al. Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness , 1996, Comput. Oper. Res..
[24] Inyong Ham,et al. A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem , 1983 .
[25] Thomas Stützle,et al. A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem , 2007, Eur. J. Oper. Res..
[26] Ihsan Sabuncuoglu,et al. Reactive scheduling in a dynamic and stochastic FMS environment , 2003 .
[27] M. Selim Akturk,et al. Match-up scheduling under a machine breakdown , 1999, Eur. J. Oper. Res..
[28] Elisabet Capón-García,et al. Costs for rescheduling actions: a critical issue for reducing the gap between scheduling theory and practice , 2008 .