A study of repairable parts inventory system operating under performance-based contract

Performance-Based Logistics (PBL) is becoming a dominant logistics support strategy, especially in the defense industry. PBL contracts are designed to serve the customer's key performance measures, while the traditional contracts for after-sales services, such as Fixed-price (FP) and Cost-plus (C+), only provide insurance or incentive. In this research, we develop an inventory model for a repairable parts system operating under a PBL contract. We model the closed-loop inventory system as an M/M/m queue in which component failures are Poisson distributed and the repair times at the service facility are exponential. Our model provides the supplier and the customer increased flexibility in achieving target availability. Analysis of key parameters suggests that to improve the availability of the system with repairable spare parts, the supplier should work to improve the components reliability and efficiency of repair facility, rather than the base stock level, which has minimal impact on system availability.

[1]  U. D. Kumar,et al.  Spares provisioning under performance-based logistics contract: profit-centric approach , 2008, J. Oper. Res. Soc..

[2]  Irene C. L. Ng,et al.  Outcome-based contracts as a driver for systems thinking and service-dominant logic in service science: evidence from the defence industry , 2009 .

[3]  J. Muckstadt A Model for a Multi-Item, Multi-Echelon, Multi-Indenture Inventory System , 1973 .

[4]  James T. Simpson,et al.  Defining and Implementing Performance-Based Logistics in Government , 2005 .

[5]  Serguei Netessine,et al.  Performance Contracting in After-Sales Service Supply Chains , 2007, Manag. Sci..

[6]  Tao Nie,et al.  Simulation of a closed loop multi-echelon repairable inventory system , 2009, 2009 International Conference on Management Science and Engineering.

[7]  Ajit Kambil,et al.  SERVICE MANAGEMENT: BUILDING PROFITS AFTER THE SALE. , 2003 .

[8]  Dirk Cattrysse,et al.  Stocking decisions for repairable spare parts pooling in a multi-hub system , 2005 .

[9]  Matthieu van der Heijden,et al.  Trade-off between inventory and repair capacity in spare part networks , 2003, J. Oper. Res. Soc..

[10]  Patrik Alfredsson,et al.  Modeling emergency supply flexibility in a two-echelon inventory system , 1999 .

[11]  Craig C. Sherbrooke,et al.  VARI-METRIC: Improved Approximations for Multi-Indenture, Multi-Echelon Availability Models , 1986, Oper. Res..

[12]  David M. Miller,et al.  Base stock level determination for high cost low demand critical repairable spares , 1994, Comput. Oper. Res..

[13]  Craig C. Sherbrooke,et al.  Metric: A Multi-Echelon Technique for Recoverable Item Control , 1968, Oper. Res..

[14]  Hank J. Devries,et al.  Performance-Based Logistics - Barriers and Enablers to Effective Implementation , 2005 .

[15]  S. Albright,et al.  Steady-state approximations for a multi-echelon multi-indentured repairable-item inventory system , 1992 .

[16]  Michael C. Fu,et al.  Models for multi-echelon repairable item inventory systems with limited repair capacity , 1997 .

[17]  Keebom Kang,et al.  A Design of Experiments Approach to Readiness Risk Analysis , 2006, Proceedings of the 2006 Winter Simulation Conference.

[18]  Geert-Jan van Houtum,et al.  Optimization of component reliability in the design phase of capital goods , 2010, Eur. J. Oper. Res..

[19]  Hoong Chuin Lau,et al.  Multi-Echelon Repairable Item Inventory System with Limited Repair Capacity under Nonstationary Demands , 2008 .

[20]  Richard M. Soland,et al.  On Some Common Interests Among Reliability, Inventory, and Queuing , 1985, IEEE Transactions on Reliability.

[21]  Vipul Agrawal,et al.  Achieving Breakthrough Service Delivery Through Dynamic Asset Deployment Strategies , 2006, Interfaces.

[22]  Keebom Kang,et al.  A decision support model for valuing proposed improvements in component reliability , 2005 .

[23]  Yunzeng Wang,et al.  A Two-Echelon Repairable Inventory System with Stocking-Center-Dependent Depot Replenishment Lead Times , 2000 .