A study of repairable parts inventory system operating under performance-based contract
暂无分享,去创建一个
[1] U. D. Kumar,et al. Spares provisioning under performance-based logistics contract: profit-centric approach , 2008, J. Oper. Res. Soc..
[2] Irene C. L. Ng,et al. Outcome-based contracts as a driver for systems thinking and service-dominant logic in service science: evidence from the defence industry , 2009 .
[3] J. Muckstadt. A Model for a Multi-Item, Multi-Echelon, Multi-Indenture Inventory System , 1973 .
[4] James T. Simpson,et al. Defining and Implementing Performance-Based Logistics in Government , 2005 .
[5] Serguei Netessine,et al. Performance Contracting in After-Sales Service Supply Chains , 2007, Manag. Sci..
[6] Tao Nie,et al. Simulation of a closed loop multi-echelon repairable inventory system , 2009, 2009 International Conference on Management Science and Engineering.
[7] Ajit Kambil,et al. SERVICE MANAGEMENT: BUILDING PROFITS AFTER THE SALE. , 2003 .
[8] Dirk Cattrysse,et al. Stocking decisions for repairable spare parts pooling in a multi-hub system , 2005 .
[9] Matthieu van der Heijden,et al. Trade-off between inventory and repair capacity in spare part networks , 2003, J. Oper. Res. Soc..
[10] Patrik Alfredsson,et al. Modeling emergency supply flexibility in a two-echelon inventory system , 1999 .
[11] Craig C. Sherbrooke,et al. VARI-METRIC: Improved Approximations for Multi-Indenture, Multi-Echelon Availability Models , 1986, Oper. Res..
[12] David M. Miller,et al. Base stock level determination for high cost low demand critical repairable spares , 1994, Comput. Oper. Res..
[13] Craig C. Sherbrooke,et al. Metric: A Multi-Echelon Technique for Recoverable Item Control , 1968, Oper. Res..
[14] Hank J. Devries,et al. Performance-Based Logistics - Barriers and Enablers to Effective Implementation , 2005 .
[15] S. Albright,et al. Steady-state approximations for a multi-echelon multi-indentured repairable-item inventory system , 1992 .
[16] Michael C. Fu,et al. Models for multi-echelon repairable item inventory systems with limited repair capacity , 1997 .
[17] Keebom Kang,et al. A Design of Experiments Approach to Readiness Risk Analysis , 2006, Proceedings of the 2006 Winter Simulation Conference.
[18] Geert-Jan van Houtum,et al. Optimization of component reliability in the design phase of capital goods , 2010, Eur. J. Oper. Res..
[19] Hoong Chuin Lau,et al. Multi-Echelon Repairable Item Inventory System with Limited Repair Capacity under Nonstationary Demands , 2008 .
[20] Richard M. Soland,et al. On Some Common Interests Among Reliability, Inventory, and Queuing , 1985, IEEE Transactions on Reliability.
[21] Vipul Agrawal,et al. Achieving Breakthrough Service Delivery Through Dynamic Asset Deployment Strategies , 2006, Interfaces.
[22] Keebom Kang,et al. A decision support model for valuing proposed improvements in component reliability , 2005 .
[23] Yunzeng Wang,et al. A Two-Echelon Repairable Inventory System with Stocking-Center-Dependent Depot Replenishment Lead Times , 2000 .