Maintenance strategy for leased equipment
暂无分享,去创建一个
[1] Ruey Huei Yeh,et al. A study of maintenance policies for second-hand products , 2011, Comput. Ind. Eng..
[2] Laurent Doyen,et al. Classes of imperfect repair models based on reduction of failure intensity or virtual age , 2004, Reliab. Eng. Syst. Saf..
[3] D. N. Prabhakar Murthy,et al. Optimal preventive maintenance of leased equipment with corrective minimal repairs , 2006, Eur. J. Oper. Res..
[4] N. Rezg,et al. Periodic and sequential preventive maintenance policies over a finite planning horizon with a dynamic failure law , 2011, J. Intell. Manuf..
[5] Ruey Huei Yeh,et al. Preventive-maintenance policy for leased products under various maintenance costs , 2011, Expert Syst. Appl..
[6] Ruey Huei Yeh,et al. Optimal threshold value of failure-rate for leased products with preventive maintenance actions , 2007, Math. Comput. Model..
[7] M. Kijima. SOME RESULTS FOR REPAIRABLE SYSTEMS WITH GENERAL REPAIR , 1989 .
[8] Ruey Huei Yeh,et al. Optimal preventive maintenance policy for leased equipment using failure rate reduction , 2009, Comput. Ind. Eng..
[9] Clifford W. Smith,et al. Determinants of Corporate Leasing Policy , 1985 .
[10] Xiaojun Zhou,et al. Reliability-centered predictive maintenance scheduling for a continuously monitored system subject to degradation , 2007, Reliab. Eng. Syst. Saf..
[11] D. N. Prabhakar Murthy,et al. Optimal periodic preventive maintenance policy for leased equipment , 2006, Reliab. Eng. Syst. Saf..