Evaluation of materials supply systems during product development projects

The aim of this paper is to analyse how materials supply systems can be evaluated during product development projects in a concurrent engineering context. The focus is on performance assessment of materials supply systems and the input data required. A case study was conducted in close cooperation with a company and two performance measures were assessed during the concept definition phase and recalculated during the product and process validation phase. The results show that preliminary input data can be used to calculate performance measures by means of the following approaches: indicators, standards or scenarios. Furthermore, it is discussed how performance assessment can assist the materials supply systems design process in a concurrent engineering context by facilitating early problem discovery, early decision-making, and common understanding.

[1]  Kristina Säfsten Evaluation of assembly systems : An exploratory study of evaluation , 2002 .

[2]  J. Dixon,et al.  Engineering Design , 2019, Springer Handbook of Mechanical Engineering.

[3]  Terry Hill,et al.  Manufacturing Strategy: Text and Cases , 1993 .

[4]  H. L. Sink,et al.  A MANAGERIAL FRAMEWORK FOR THE ACQUISITION OF THIRD-PARTY LOGISTICS SERVICES. , 1997 .

[5]  Don Clausing Total quality development : a step-by-step guide to world class concurrent engineering , 1994 .

[6]  Patrick D. T. O'Connor Total Quality Development: A Step‐by‐Step Guide to World Class Concurrent Engineering, Don Clausing, ASME Press, 1994. Number of pages: 506. Price: £42.00 , 1995 .

[7]  Klaus-Dieter Thoben,et al.  Capturing and assessing formal interaction at task level in product development , 1997 .

[8]  K. Eisenhardt Building theories from case study research , 1989, STUDI ORGANIZZATIVI.

[9]  Birgitta Öjmertz Materials Handling from a Value-Adding Perspective , 1998 .

[10]  T. Fujimoto,et al.  The Effect of “ Front-Loading ” Problem-Solving on Product Development Performance , 2000 .

[11]  Kristina Säfsten,et al.  Design Driven Evaluation of Production Systems , 2001 .

[12]  John W. Henke Strategic Selling in the Age of Modules and Systems , 2000 .

[13]  R. Kaplan,et al.  The balanced scorecard--measures that drive performance. , 2015, Harvard business review.

[14]  DEVELOPMENT OF PERFORMANCE MEASURES FOR WORLD CLASS MANUFACTURING , 2006 .

[15]  B. Wu,et al.  Manufacturing systems design and analysis : context and techniques , 1994 .

[16]  Walter Eversheim,et al.  Information management for concurrent engineering , 1997, Eur. J. Oper. Res..

[17]  Christoph H. Loch,et al.  Exchanging Preliminary Information in Concurrent Engineering: Alternative Coordination Strategies , 2002, Organ. Sci..

[18]  Andy Neely,et al.  Performance measurement system design: developing and testing a process‐based approach , 2000 .

[19]  David Bennett,et al.  Market-Focused Production Systems: Design and Implementation , 1993 .

[20]  Anders Larsson Proximity matters? : geographical aspects of changing strategies in automotive subcontracting relationships : the case of domestic suppliers to Volvo Torslanda assembly plant , 1999 .

[21]  R. Yin Case Study Research: Design and Methods , 1984 .

[22]  Mats I. Johansson,et al.  The information gap between design engineering and materials supply systems design , 2003 .

[23]  Laura M. Birou,et al.  Supplier Involvement in Integrated Product Development , 1994 .