Hall Marks in Construction Material Management: A Literature Review

Construction project implementation in India is still facing challenges. The main hurdles are failure to solve project specific problems. Generally projects taken up for implementation will never complete, in time or complete at a later stage leaving cost and time overrun. Researchers are trying to find out the reasons why projects could not complete in time. An exhaustive Literature review has been conducted. The research problem is identified and derived from the literature study.

[2]  Stuart Tennant,et al.  Construction management teams & project performance - a diagnostic toolkit , 2005 .

[3]  Samuel Labi,et al.  Three-Stage Least-Squares Analysis of Time and Cost Overruns in Construction Contracts , 2010 .

[4]  M. Kumaraswamy,et al.  Choosing Concessionaires in BOT-type Projects , 2000 .

[5]  Khaled A El-Rayes,et al.  Multiobjective optimization of resource leveling and allocation during construction scheduling , 2011 .

[6]  Chang-Taek Hyun,et al.  Partnering Process Model for Public-Sector Fast-Track Design-Build Projects in Korea , 2010 .

[7]  Alan D. Russell,et al.  Assessing Infrastructure Project Innovation Potential as a Function of Procurement Mode , 2008 .

[8]  Ac Baker,et al.  Fast-tracking for nuclear power plant construction , 1983 .

[9]  A. D. Wilkie,et al.  Capital Projects , 1995, British Actuarial Journal.

[10]  Andrew D.F. Price,et al.  A framework for pre-project planning , 1999 .

[11]  Kiyoung Son,et al.  Schedule Effectiveness of Alternative Contracting Strategies for Transportation Infrastructure Improvement Projects , 2012 .

[12]  J. Glass,et al.  AN INVESTIGATION INTO THE IMPACT OF PROCUREMENT SYSTEMS ON WASTE GENERATION: THE CONTRACTORS' PERSPECTIVE , 2009 .

[13]  K. N. Jha,et al.  Factors affecting cost performance: evidence from Indian construction projects , 2005 .

[14]  Marianne Forman,et al.  Association of Researchers in Construction Management (ARCOM) , 2011 .

[15]  Melinda Hodkiewicz,et al.  Integrated Model for Optimizing Strategic Overhaul Planning of Distributed Pump Stations , 2011 .

[16]  Roger Flanagan,et al.  THE IMPACT OF EFFECTIVE MATERIAL MANAGEMENT ON CONSTRUCTION SITE PERFORMANCE FOR SMALL AND MEDIUM SIZED CONSTRUCTION ENTERPRISES , 2009 .

[17]  Mani Golparvar-Fard,et al.  Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs , 2009 .

[18]  Anthony Merna,et al.  Project management is a capital investment process , 2005 .

[19]  Min-Yuan Cheng,et al.  Dynamic Prediction of Project Success Using Artificial Intelligence , 2007 .

[21]  Mohammed Dulaimi,et al.  PROCURING FOR INNOVATION: THE INTEGRATING ROLE OF INNOVATION IN CONSTRUCTION PROCUREMENT , 2005 .

[22]  Kumar Neeraj Jha,et al.  Prediction of schedule performance of Indian construction projects using an artificial neural network , 2011 .

[23]  Z. Ren,et al.  ROOT CAUSES OF CONSTRUCTION PROJECT DELAYS IN DUBAI , 2008 .

[24]  William Ibbs,et al.  Schedule Analysis under the Effect of Resource Allocation , 2007 .