Balancing assembly lines with variable parallel workplaces: Problem definition and effective solution procedure

[1]  Armin Scholl,et al.  Incorporating ergonomic risks into assembly line balancing , 2011, Eur. J. Oper. Res..

[2]  Türkay Dereli,et al.  Two-sided assembly line balancing using an ant-colony-based heuristic , 2008 .

[3]  Nils Boysen,et al.  A classification of assembly line balancing problems , 2007, Eur. J. Oper. Res..

[4]  Armin Scholl,et al.  State-of-the-art exact and heuristic solution procedures for simple assembly line balancing , 2006, Eur. J. Oper. Res..

[5]  Armin Scholl,et al.  A survey on problems and methods in generalized assembly line balancing , 2006, Eur. J. Oper. Res..

[6]  Angel B. Ruiz,et al.  Balancing assembly lines with tabu search , 2006, Eur. J. Oper. Res..

[7]  Angel B. Ruiz,et al.  Balancing assembly lines: an industrial case study , 2004, J. Oper. Res. Soc..

[8]  Krzysztof Fleszar,et al.  An enumerative heuristic and reduction methods for the assembly line balancing problem , 2003, Eur. J. Oper. Res..

[9]  Sándor P. Fekete,et al.  New classes of fast lower bounds for bin packing problems , 2001, Math. Program..

[10]  Yeongho Kim,et al.  Two-sided assembly line balancing to maximize work relatedness and slackness , 2001 .

[11]  Yeongho Kim,et al.  Two-sided assembly line balancing: A genetic algorithm approach , 2000 .

[12]  Robert Klein,et al.  Scheduling of Resource-Constrained Projects , 1999 .

[13]  Armin Scholl,et al.  Balancing assembly lines effectively - A computational comparison , 1999, Eur. J. Oper. Res..

[14]  Armin Scholl,et al.  SALOME: A Bidirectional Branch-and-Bound Procedure for Assembly Line Balancing , 1997, INFORMS J. Comput..

[15]  Armin Scholl,et al.  Bison: A fast hybrid procedure for exactly solving the one-dimensional bin packing problem , 1997, Comput. Oper. Res..

[16]  Armin Scholl,et al.  Balancing and Sequencing of Assembly Lines , 1995 .

[17]  Rainer Kolisch,et al.  Project Scheduling under Resource Constraints: Efficient Heuristics for Several Problem Classes , 1995 .

[18]  Alessandro Agnetis,et al.  Balancing flexible lines for car components assembly , 1995 .

[19]  Robert R. Inman,et al.  SCHEDULING DUPLICATE SERIAL STATIONS IN TRANSFER LINES , 1994 .

[20]  Enn Tyugu,et al.  Constraint Programming , 1994, NATO ASI Series.

[21]  J. J. Bartholdi,et al.  Balancing two-sided assembly lines: a case study , 1993 .

[22]  Ram Rachamadugu,et al.  Assembly line design with incompatible task assignments , 1991 .

[23]  Francis J. Nourie,et al.  Finding optimal line balances with OptPack , 1991, Oper. Res. Lett..

[24]  Paolo Toth,et al.  Knapsack Problems: Algorithms and Computer Implementations , 1990 .

[25]  Jonathan F. Bard,et al.  Assembly line balancing with parallel workstations and dead time , 1989 .

[26]  Roger V. Johnson,et al.  Optimally balancing large assembly lines with `FABLE' , 1988 .

[27]  Ilker Baybars,et al.  A survey of exact algorithms for the simple assembly line balancing , 1986 .

[28]  Roger V. Johnson,et al.  A Branch and Bound Algorithm for Assembly Line Balancing Problems with Formulation Irregularities , 1983 .

[29]  Hirokazu Osaki,et al.  A method for assembly line balancing with more than one worker in each station , 1983 .

[30]  Michael J. Magazine,et al.  Assembly line balancing as generalized bin packing , 1982, Oper. Res. Lett..

[31]  Peter A. Pinto,et al.  Branch and bound and heuristic procedures for assembly line balancing with paralleling of stations , 1981 .

[32]  G. M. Buxey,et al.  Assembly Line Balancing with Multiple Stations , 1974 .

[33]  Maurice Kilbridge,et al.  A REVIEW OF ANALYTICAL SYSTEMS OF LINE BALANCING , 1962 .

[34]  Fred M. Tonge,et al.  Summary of a Heuristic Line Balancing Procedure , 1960 .

[35]  James R. Jackson,et al.  A Computing Procedure for a Line Balancing Problem , 1956 .

[36]  Armin Scholl,et al.  Jena Research Papers in Business and Economics On a Learning Precedence Graph Concept for the Automotive Industry , 2010 .

[37]  A. Scholl,et al.  ABSALOM: Balancing assembly lines with assignment restrictions , 2008 .

[38]  Erik Demeulemeester,et al.  Project scheduling : a research handbook , 2002 .

[39]  Hartmut Stadtler,et al.  Supply Chain Management and Advanced Planning , 2000 .

[40]  Roman Słowiński,et al.  Advances in project scheduling , 1989 .

[41]  Bhaba R. Sarker,et al.  A generalized approach for serial or parallel line balancing , 1983 .

[42]  Basheer M. Khumawala,et al.  A branch and bound algorithm for assembly line balancing with paralleling , 1975 .

[43]  Eugene L. Lawler,et al.  Optimal Sequencing of a Single Machine Subject to Precedence Constraints , 1973 .

[44]  A. L. Arcus,et al.  COMSOAL: a computer method of sequencing operations for assembly lines , 1965 .