Probabilistic DCF Analysis and Capital Budgeting and Investment—a Survey
暂无分享,去创建一个
[1] B. Wagle,et al. A Statistical Analysis of Risk in Capital Investment Projects , 1967 .
[2] Giuseppe Alesii. Payback Period and Internal Rate of Return in Real Options Analysis , 2006 .
[3] Van Horne,et al. Financial Management and Policy , 1968 .
[4] Moments of the Present Worths of General Probabilistic Cash Flows Under Random Timing , 1987 .
[5] John R. Canada,et al. Capital Investment Decision Analysis for Management and Engineering , 1980 .
[7] Abraham Charnes,et al. A Chance-Constrained Approach to Capital Budgeting with Portfolio Type Payback and Liquidity Constraints and Horizon Posture Controls , 1967, Journal of Financial and Quantitative Analysis.
[10] F. Hillier. The evaluation of risky interrelated investments , 1966 .
[11] Sanghoon Kim,et al. SAFETY MARGIN ALLOCATION AND RISK ASSESSMENT UNDER THE NPV METHOD , 1985 .
[12] Tian-Shy Liou,et al. Fuzzy Decision Analysis for Alternative Selection Using a Fuzzy Annual Worth Criterion , 2006 .
[13] Frederick S. Hillier,et al. For the Decision Maker—An Analytical Approach to Evaluating Risky Capital Investments , 1965 .
[14] Ambrose Goicoechea,et al. An approach to risk and uncertainty in benefit‐cost analysis of water resources projects , 1982 .
[15] Adedeji Badiru,et al. Fuzzy Present Value Analysis Model For Evaluating Information System Projects , 2007 .
[16] John J. Flaig. Improving Project Selection Using Expected Net Present Value Analysis , 2005 .
[17] David G. Carmichael,et al. Project Management Framework , 2003 .
[18] Davi Carmichael. Project planning and control , 2006 .
[19] Variation of Project Life As a Means for Adjusting for Risk , 1976 .
[20] Probabilistic Benefit-Cost Analysis , 1984 .
[21] Robert W. Grubbström,et al. On The Application of the Laplace Transform to Certain Economic Problems , 1967 .
[22] F. Hillier. THE DERIVATION OF PROBABILISTIC INFORMATION FOR THE EVALUATION OF RISKY INVESTMENTS , 1963 .
[23] Inter-Temporal Correlation of Cash Flows and the Risk of Multi-Period Investment Projects , 1980 .
[24] Khaled Nassar,et al. Simplified approach to probabilistic cost benefit analysis : Architectural lighting example , 2006 .
[25] Lawrence L. Kupper,et al. Probability, statistics, and decision for civil engineers , 1970 .
[26] P. G. Moore,et al. The Consideration of Risk in Project Selection , 1968 .
[27] H. Jacoby,et al. Investment Analysis Using the Probability Distribution of the Internal Rate of Return , 1975 .
[28] James C. T. Mao,et al. SURVEY OF CAPITAL BUDGETING: THEORY AND PRACTICE , 1970 .
[29] Sang-Hoon Kim,et al. Estimation of Periodic Standard Deviations Under the Pert and Derivatio of Probabilistic Information , 1988 .
[30] Eduardo S. Schwartz,et al. Investment Under Uncertainty. , 1994 .
[31] Lynn E. Bussey,et al. Formulating Correlated Cash Flow Streams , 1972 .
[32] Da Ruan,et al. Capital budgeting techniques using discounted fuzzy versus probabilistic cash flows , 2002, Inf. Sci..
[33] Joseph Sarkis,et al. Real Options Analysis for “Green Trading”: The Case of Greenhouse Gases , 2005 .
[34] J. V. Horne,et al. Capital-Budgeting Decisions Involving Combinations of Risky Investments , 1966 .
[35] Donovan Young,et al. Expected Present Worths of Cash Flows Under Uncertain Timing , 1975 .
[36] Maurizio Schenone,et al. Risk Analysis in the Evaluation of Plant Investments: The Contribution of a Non-Deterministic Approach , 2001 .
[37] H. Weingartner. Capital Budgeting of Interrelated Projects: Survey and Synthesis , 1966 .
[38] Cengiz Kahraman,et al. Probabilistic cash flows and equivalent discount rates , 1999, IEEE SMC'99 Conference Proceedings. 1999 IEEE International Conference on Systems, Man, and Cybernetics (Cat. No.99CH37028).
[39] Chan S. Park. Contemporary Engineering Economics , 1993 .
[40] Randolph Westerfield,et al. A PROBLEM IN PROBABILITY DISTRIBUTION TECHNIQUES FOR CAPITAL BUDGETING , 1972 .
[41] C. P. Bonini. Capital Investment under Uncertainty with Abandonment Options , 1977 .
[42] Carmelo Giaccotto. A Simplified Approach to Risk Analysis in Capital Budgeting With Serially Correlated Cash Flows , 1984 .
[43] J. Wesley Barnes,et al. A Methodology for obtaining the probability density function of the present worth of probabilistic cash flow profiles , 1978 .
[44] ON THE INADEQUACY OF A PROBABILISTIC INTERNAL RATE OF RETURN , 1979 .
[45] F. B. Renwick,et al. Introduction to investments and finance : theory and analysis , 1974 .
[46] Richard H. Bernhard. Mathematical Programming Models for Capital Budgeting—A Survey, Generalization, and Critique , 1969 .
[47] Surendra S. Singvi. A practical approach to risk and sensitivity analyses , 1980 .
[49] H. Martin Weingartner,et al. Some New Views on the Payback Period and Capital Budgeting Decisions , 1969 .
[50] Yeou-Koung Tung,et al. Probability Distribution for Benefit/Cost Ratio and Net Benefit , 1992 .
[51] COMMENT ON “FORMULATING CORRELATED CASH FLOW STREAMS” , 1975 .
[52] B. Motazed,et al. A Probabilistic Approach to Risk Analysis in Capital Investment Projects , 1977 .
[53] Richard E. Rosenthal. The Variance of Present Worth of Cash Flows Under Uncertain Timing , 1977 .
[54] Frederick S. Hillier. Communications to the Editor—Supplement to “The Derivation of Probabilistic Information for the Evaluation of Risky Investments” , 1965 .
[55] Graeme C. Dandy. An Approximate Method for the Analysis of Uncertainty in Benefit‐Cost Ratios , 1985 .
[56] Stanley B. Block. Are “Real Options” Actually Used in the Real World? , 2007 .