Identification of potential improvement areas in industrial housing : a case study of waste
暂无分享,去创建一个
[1] Thais da C. L. Alves,et al. Investigation of the Supply Chain of Prefabricated Wooden Doors , 2010 .
[2] Eric Johansen,et al. Understanding Lean Construction and How It Penetrates the Industry - A Comparison of the Dissemination of Lean , 2002 .
[3] David Strake. Value Stream Management for The Lean Office , 2004 .
[4] Martin Loosemore,et al. A theory of waste behaviour in the construction industry , 2001 .
[5] Lauri Koskela,et al. Application of the New Production Philosophy to Construction , 1992 .
[6] Hans C. Bjornsson,et al. Identification and Classification of Value Drivers for a New Production Homebuilding Supply Chain , 2002 .
[7] Guillermo J. Velarde,et al. Process flow improvement proposal using lean manufacturing philosophy and simulation techniques on a modular home manufacturer , 2009 .
[8] Tariq S. Abdelhamid,et al. The Challenge: The Impetus for Change to Lean Project Delivery , 2003 .
[9] 大野 耐一,et al. Toyota production system : beyond large-scale production , 1988 .
[10] Jayant Rajgopal,et al. Analyzing the benefits of lean manufacturing and value stream mapping via simulation: A process sector case study , 2007 .
[11] Glenn Ballard,et al. Lean Supply Systems in Construction , 2004 .
[12] Per-Erik Josephson,et al. Slöseri i byggprojekt: behov av förändrat synsätt , 2005 .
[13] Nick Rich,et al. The seven value stream mapping tools , 1997 .
[14] Lauri Koskela,et al. Understanding construction supply chains: an alternative interpretation , 2001 .
[15] Mohamed Mohamed Naim,et al. Selecting The Right Strategy To Meet Customer Requirements , 2000 .
[16] R. Yin. Case Study Research: Design and Methods , 1984 .
[17] Chris Butterworth,et al. Value Stream Management , 1998 .
[18] Lauri Koskela,et al. The four roles of supply chain management in construction , 2000 .
[19] Gregory A. Howell,et al. Competing Construction Management Paradigms , 2003, Lean Construction Journal.
[20] W. R. Seed,et al. Lean construction. , 2010, HERD.
[21] Alan Mossman,et al. Why isn't the UK construction industry going lean with gusto? , 2009 .
[22] Eric Johansen,et al. Lean Construction: Prospects for the German construction industry , 2007, Lean Construction Journal.
[23] Lars Stehn,et al. Lean principles in industrialized housing production: the need for a cultural change , 2008 .
[24] James P. Womack,et al. Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .
[25] Iris D. Tommelein,et al. VALUE STREAM ANALYSIS OF CONSTRUCTION SUPPLY CHAINS: CASE STUDY ON PIPE SUPPORTS USED IN POWER PLANTS , 2002 .
[26] Sven Bertelsen,et al. Lean Construction: Where Are We and How To Proceed? , 2004, Lean Construction Journal.
[27] Anders Björnfot,et al. PRODUCT DESIGN FOR IMPROVED MATERIAL FLOW—A MULTI-STOREY TIMBER HOUSING PROJECT , 2005 .
[28] Anders Björnfot,et al. Prefabrication: A Lean Strategy for Value Generation in Construction , 2006 .
[29] A. Fearne,et al. Efficiency versus effectiveness in construction supply chains: the dangers of “lean” thinking in isolation , 2006 .
[30] R. Yin. The abridged version of case study research: Design and method. , 1998 .
[31] Iris D. Tommelein,et al. Value stream analysis of a re-engineered construction supply chain , 2003 .
[32] Lauri Koskela,et al. Roles of supply chain management in construction , 1999 .
[33] Lars Stehn,et al. Industrialised housing –definition and categorization of the concept , 2005 .
[34] Lauri Koskela,et al. Moving-on — beyond lean thinking , 2004 .
[35] H. Randolph Thomas,et al. LEARNING CURVE MODELS OF CONSTRUCTION PRODUCTIVITY , 1986 .