Quantity-Based Approach to Preliminary Cost Estimates for Highway Projects
暂无分享,去创建一个
James T. O'Connor | Jui-Sheng Chou | Khali R Persad | Min Peng | Jui-Sheng Chou | K. Persad | J. O’Connor | Min Peng
[1] Ali Touran,et al. Probabilistic Model for Cost Contingency , 2003 .
[2] David Lowe,et al. Data modelling and the application of a neural network approach to the prediction of total construction costs , 2002 .
[3] InduShobha N. Chengalur-Smith,et al. Modeling the costs of bridge rehabilitation , 1997 .
[4] Tarek Hegazy,et al. NEURAL NETWORK MODEL FOR PARAMETRIC COST ESTIMATION OF HIGHWAY PROJECTS , 1998 .
[5] Søren L. Buhl,et al. Underestimating Costs in Public Works Projects: Error or Lie? , 2002, 1303.6604.
[6] M. M. Bakhoum,et al. Preliminary quantity estimate of highway bridges using neural networks , 2001 .
[7] S. Christian Albright,et al. Data Analysis and Decision Making with Microsoft Excel , 1999 .
[8] Kumares C. Sinha,et al. STATISTICAL MODELS FOR THE ESTIMATION OF BRIDGE REPLACEMENT COSTS , 1991 .
[9] P. Bobko. Correlation and Regression: Applications for Industrial Organizational Psychology and Management , 2001 .
[10] Jonathon E. Byrnes. Best Practices for Highway Project Cost Estimating , 2002 .
[11] Philip Bobko,et al. Correlation and Regression: Applications for Industrial Organizational Psychology and Management , 2001 .
[12] Pravin K. Trivedi,et al. Regression Analysis of Count Data , 1998 .
[13] Albert F Kaminsky. Preliminary Cost Estimating for Highway Construction Projects. , 1986 .
[14] V. Barnett,et al. Applied Linear Statistical Models , 1975 .
[15] Garold D. Oberlender,et al. Predicting Accuracy of Early Cost Estimates using Factor Analysis and Multivariate Regression , 2003 .
[16] JayEtta Z. Hecker. Transportation Infrastructure: Cost and Oversight Issues on Major Highway and Bridge Projects , 2002 .