X charts with variable sampling intervals
暂无分享,去创建一个
J. A. Nachlas | J. C. Arnold | J. Nachlas | R. Jr.ReynoldsMarion | R. Amin | Marion R. Reynolds | Raid W. Amin | Jesse C. Arnold
[1] Marion R. Reynolds,et al. Variable sampling intervals for multiparameter shewhart charts , 1989 .
[2] Marion R. Reynolds,et al. Chart with runs and variable sampling intervals , 1988 .
[3] Charles W. Champ,et al. Exact results for shewhart control charts with supplementary runs rules , 1987 .
[4] J. C. Arnold,et al. Economically optimal markovian sampling policies for process monitoring , 1986 .
[5] D. R. Jensen,et al. Markovian Time-Delay Sampling Policies. , 1980 .
[6] S. Smeach,et al. Further aspects of a Markovian sampling policy for water quality monitoring. , 1977, Biometrics.
[7] J. C. Arnold. A Markovian Sampling Policy Applied to Water Quality Monitoring of Streams , 1970 .
[8] Joachim I. Weindling,et al. Mean Action Time of the X-Bar Control Chart with Warning Limits , 1970 .
[9] E. S. Page. A modified control chart with warning lines , 1962 .