Combining Value Stream and Process Levels Analysis for Continuous Flow Implementation in Construction

This research focuses on the use of concepts and tools of Lean Thinking seeking the implementation of continuous flow in construction. An exploratory case research approach was used in the work. Such study was carried out in a construction site of a resort in the northeast region of Brazil. Taking as a basis literature and successful implementation path used in other industries, a combined analysis was used, first in value stream level and second in processes level. As result of this research, Value Stream Maps (YSM) of the execution of the standard apartment was drawn for a sample of services, including dry wall and ceramic tiling. The maps made possible an organized discussion about the applicability of important lean concepts, such as: takt time, cell production, etc. Line of Balance, Operator Balance Charts and Standardized Work Combination Table were analysed to improve flow. As conclusion, the path of implementation suggested in lean literature and used in several other industries presented interesting potential considering this case study and encourages future studies using and detailing this approach.

[1]  Olli Seppänen,et al.  Task planning as a part of production control , 2004 .

[2]  Yoshitaka Nakagawa,et al.  Toyota Production System Adopted by Building Construction in Japan , 2004 .

[3]  Lauri Koskela,et al.  Application of the New Production Philosophy to Construction , 1992 .

[4]  Ad Santos,et al.  Application of flow principles in the production management of construction sites , 1999 .

[5]  Glenn Ballard,et al.  What Kind of Production Is Construction , 1998 .

[6]  Wallace J. Hopp,et al.  Factory physics : foundations of manufacturing management , 1996 .

[7]  Herman Glenn Ballard,et al.  THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .

[8]  A. Posner Learning to see. , 1955, Eye, ear, nose & throat monthly.

[9]  Mike Rother,et al.  Crossroads: Which Way Will You Turn on the Road to Lean? , 1997 .

[10]  Kerry London,et al.  Construction supply chain modeling : a research review and interdisciplinary research agenda , 2004 .

[11]  Paul Lillrank,et al.  The Transfer of Management Innovations from Japan , 1995 .

[12]  Iris D. Tommelein,et al.  Just-in-Time Concrete Delivery: Mapping Alternatives for Vertical Supply Chain Integration , 1999 .

[13]  Tomaso Poggio,et al.  Learning to see , 1996 .

[14]  John Tookey,et al.  APPLYING THE CONCEPT OF MOBILE CELL MANUFACTURING ON THE DRYWALL PROCESS , 2002 .

[15]  O. Seppänen,et al.  Empirical Research on Deviations in Production and Current State of Project Control , 2004 .

[16]  Daniel Roos,et al.  The machine that changed the world : the story of lean production , 1991 .

[17]  James P. Womack,et al.  Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .

[18]  Iris D. Tommelein,et al.  REDUCING LEAD TIME FOR ELECTRICAL SWITCHGEAR , 2002 .

[19]  Glenn Ballard,et al.  Cycle Time Reduction in Home Building , 2001 .

[20]  James A. Powell,et al.  Potential of Poka-Yoke Devices to Reduce Variability in Construction , 1999 .

[21]  Lauri Koskela,et al.  An exploration towards a production theory and its application to construction , 2000 .

[22]  James A. Powell,et al.  AN EXPLORATORY STUDY ON THE APPLICABILITY OF PROCESS TRANSPARENCY IN CONSTRUCTION SITES , 2002 .

[23]  Russell Kenley,et al.  Project Micro-Management: Practical Site Planning and Management of Work Flow , 2004 .

[24]  Ariovaldo Denis Granja,et al.  Construction Sites: Using Lean Principles to Seek Broader Implementations , 2004 .