A Hybrid MCDM Technique for Risk Management in Construction Projects
暂无分享,去创建一个
Edmundas Kazimieras Zavadskas | Samarjit Kar | Jolanta Tamosaitiene | Kajal Chatterjee | Krishnendu Adhikary | S. Kar | E. Zavadskas | J. Tamošaitienė | Kajal Chatterjee | K. Adhikary
[1] Jian-qiang Wang,et al. An Interval Type-2 Fuzzy Likelihood-Based MABAC Approach and Its Application in Selecting Hotels on a Tourism Website , 2017, Int. J. Fuzzy Syst..
[2] Jeng-Hsiang Lin,et al. Applying Analytic Network Process to the Selection of Construction Projects , 2016 .
[3] Simon Smith,et al. Tools for selecting appropriate risk management techniques in the built environment , 2008 .
[4] Justus N. Agumba,et al. Risk management in the construction industry: A new literature review , 2016 .
[5] Yong Deng,et al. D-CFPR: D numbers extended consistent fuzzy preference relations , 2014, Knowl. Based Syst..
[6] Yong Hu,et al. A novel distance function of D numbers and its application in product engineering , 2016, Eng. Appl. Artif. Intell..
[7] Reza Ghodsi,et al. Construction project risk assessment by using adaptive-network-based fuzzy inference system: An empirical study , 2014 .
[8] Xinyang Deng,et al. D-DEMATEL: a new method to identify critical success factors in emergency management , 2017 .
[9] Mohammad Mahdavi Mazdeh,et al. Knowledge-based strategy selection: a hybrid model and its implementation , 2016 .
[10] Mladen Radujković,et al. Internal and external risk based assesment and evaluation for the large infrastructure projects , 2016 .
[11] Vahidreza Yousefi,et al. Proposing a neural network model to predict time and cost claims in construction projects , 2016 .
[12] Yongchuan Tang,et al. Conflicting evidence combination based on uncertainty measure and distance of evidence , 2016, SpringerPlus.
[13] Francisco Herrera,et al. Some issues on consistency of fuzzy preference relations , 2004, Eur. J. Oper. Res..
[14] Shahid Iqbal,et al. Risk management in construction projects , 2015 .
[15] Yong Hu,et al. A Modified TOPSIS Method Based onDNumbers and Its Applications in Human Resources Selection , 2016 .
[16] Amarsinh B. Landage,et al. Risk Management in Construction Industry , 2016 .
[17] Xinyang Deng,et al. Bridge Condition Assessment Using D Numbers , 2014, TheScientificWorldJournal.
[18] Pan Yue,et al. A hybrid fuzzy evaluation method for curtain grouting efficiency assessment based on an AHP method extended by D numbers , 2016, Expert Syst. Appl..
[19] Gordan Stojic,et al. Novel Integrated Multi-Criteria Model for Supplier Selection: Case Study Construction Company , 2017, Symmetry.
[20] Zenonas Turskis,et al. A model of discrete zero-sum two-person matrix games with grey numbers to solve dispute resolution problems in construction , 2017 .
[21] Norhazilan Md Noor,et al. Hybrid SWARA-COPRAS method for risk assessment in deep foundation excavation project: an Iranian case study , 2017 .
[22] Joseph H. M. Tah,et al. A proposal for construction project risk assessment using fuzzy logic , 2000 .
[23] Edmundas Kazimieras Zavadskas,et al. Risk evaluation of tunneling projects , 2012 .
[24] Marjan S. Jalali,et al. A fuzzy knowledge-based framework for risk assessment of residential real estate investments , 2017 .
[25] Mehdi Tavakolan,et al. Construction project risk assessment using combined fuzzy and FMEA , 2013, 2013 Joint IFSA World Congress and NAFIPS Annual Meeting (IFSA/NAFIPS).
[26] Witold Pedrycz,et al. Fuzzy Monte Carlo Simulation and Risk Assessment in Construction , 2010, Comput. Aided Civ. Infrastructure Eng..
[27] Willy Herroelen,et al. A Methodology for Integrated Risk Management and Proactive Scheduling of Construction Projects , 2008 .
[28] Xinyang Deng,et al. Supplier selection using AHP methodology extended by D numbers , 2014, Expert Syst. Appl..
[29] Mehdi Keshavarz Ghorabaee,et al. A NEW COMBINATIVE DISTANCE-BASED ASSESSMENT(CODAS) METHOD FOR MULTI-CRITERIA DECISION-MAKING , 2016 .
[30] Dohyun Pak,et al. Iterative Speedup by Utilizing Symmetric Data in Pricing Options with Two Risky Assets , 2017, Symmetry.
[31] Serdar Ulubeyli,et al. Fuzzy multi-criteria decision making model for subcontractor selection in international construction projects , 2015 .
[32] Edmundas Kazimieras Zavadskas,et al. Risk assessment of construction projects , 2010 .
[33] M. Dulaimi,et al. Risk management framework for construction projects in developing countries , 2004 .
[34] Gwang-Hee Kim,et al. Comparison of Risk Assessment for a Nuclear Power Plant Construction Project Based on Analytic Hierarchy Process and Fuzzy Analytic Hierarchy Process , 2016 .
[35] Madjid Tavana,et al. An integrated green supplier selection approach with analytic network process and improved Grey relational analysis , 2015 .
[36] Wen Jiang,et al. A Method to Determine Generalized Basic Probability Assignment in the Open World , 2016 .
[37] Hu-Chen Liu,et al. An interval-valued intuitionistic fuzzy MABAC approach for material selection with incomplete weight information , 2016, Appl. Soft Comput..
[38] Cláudia Ribeiro,et al. Occurrence of Chiral Bioactive Compounds in the Aquatic Environment: A Review , 2017, Symmetry.
[39] Ru-Jen Chao,et al. Supplier selection using consistent fuzzy preference relations , 2012, Expert Syst. Appl..
[40] Mehdi Ravanshadnia,et al. Semi-Ideal Bidding via a Fuzzy TOPSIS Project Evaluation Framework in Risky Environments , 2014 .
[41] Jian-Bo Yang,et al. A DST-based approach for construction project risk analysis , 2013, J. Oper. Res. Soc..
[42] Antônio Edésio Jungles,et al. Risk Level Assessment in Construction Projects Using the Schedule Performance Index , 2016 .
[43] Seppo Junnila,et al. Business model renewal in context of integrated solutions delivery: a network perspective , 2017 .
[44] Yong Yang,et al. Pythagorean Fuzzy Choquet Integral Based MABAC Method for Multiple Attribute Group Decision Making , 2016, Int. J. Intell. Syst..
[45] Abbas Mardani,et al. A new hybrid fuzzy cybernetic analytic network process model to identify shared risks in PPP projects , 2016 .
[46] Reza Tavakkoli-Moghaddam,et al. Using the Analytical Network Process to Select the Best Strategy for Reducing Risks in a Supply Chain , 2013 .
[47] Andrew D.F. Price,et al. Modelling global risk factors affecting construction cost performance , 2003 .
[48] Sankaran Mahadevan,et al. Environmental impact assessment based on D numbers , 2014, Expert Syst. Appl..
[49] Bon-Gang Hwang,et al. Risk identification and allocation in underground rail construction joint ventures: contractors’ perspective , 2015 .
[50] Seyed Mehdi Abtahi,et al. Risk Management in Supply Chain using Consistent Fuzzy Preference Relations , 2014 .
[51] Ana Nieto-Morote,et al. A fuzzy approach to construction project risk assessment , 2011 .
[52] Ximena Ferrada,et al. Risk Management in Construction Projects: A Knowledge-based Approach , 2014 .
[53] Daijun Wei,et al. A Multi-Attribute Decision Making for Investment Decision Based on D Numbers Methods , 2016 .
[54] Osama Moselhi,et al. Risk identification and assessment for engineering procurement construction management projects using fuzzy set theory , 2016 .
[55] Martin Schieg. Risk management in construction project management , 2006 .
[56] Xi Chen,et al. A D-VIKOR Method for Medicine Provider Selection , 2014, 2014 Seventh International Joint Conference on Computational Sciences and Optimization.
[57] Agnieszka Dziadosz,et al. Risk Analysis in Construction Project - Chosen Methods , 2015 .
[58] A. Akintoye,et al. Risk analysis and management in construction , 1997 .
[59] Dragan Pamucar,et al. The selection of transport and handling resources in logistics centers using Multi-Attributive Border Approximation area Comparison (MABAC) , 2015, Expert Syst. Appl..
[60] Hu-Chen Liu,et al. Failure mode and effects analysis using D numbers and grey relational projection method , 2014, Expert Syst. Appl..
[61] Guofeng Wen. Construction project risk evaluation based on Rough Sets and Artificial Neural Networks , 2010, 2010 Sixth International Conference on Natural Computation.
[62] Dragan Pamučar,et al. Application the MABAC method in support of decision-making on the use of force in a defensive operation , 2016 .
[63] Simona Dzitac,et al. PRUDENT DECISIONS TO ESTIMATE THE RISK OF LOSS IN INSURANCE , 2017 .
[64] Aminah Robinson Fayek,et al. Risk Management in the Construction Industry Using Combined Fuzzy FMEA and Fuzzy AHP , 2010 .
[65] Terry Lyons,et al. Project risk management in the Queensland engineering construction industry : a survey , 2004 .
[66] Wen Jiang,et al. An Improved Belief Entropy and Its Application in Decision-Making , 2017, Complex..
[67] Osman Taylan,et al. Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies , 2014, Appl. Soft Comput..
[68] Sankaran Mahadevan,et al. Supplier selection based on evidence theory and analytic network process , 2016 .
[69] Mohsen Ahmadi,et al. Comprehensive Risk Management using Fuzzy FMEA and MCDA Techniques in Highway Construction Projects , 2016 .
[70] Mu’azu Mohammed Abdullahi,et al. DEMATEL-ANP Risk Assessment in Oil and Gas Construction Projects , 2017 .
[71] Chih-Han Kao,et al. Success factors for Taiwanese contractors collaborating with local Chinese contractors in construction projects , 2016 .
[72] Mohammadsadegh Mobin,et al. An Intuitionistic Fuzzy-Based DEMATEL to Rank Risks of Construction Projects , 2016 .
[73] Dariusz Skorupka,et al. Identification and Initial Risk Assessment of Construction Projects in Poland , 2008 .
[74] S Pamucar Dragan,et al. Use of the fuzzy AHP-MABAC hybrid model in ranking potential locations for preparing laying-up positions , 2016 .