Measuring the Impact of Additional Rail Traffic Using Highway and Railroad Metrics
暂无分享,去创建一个
Long term demand for freight movements in North America is expected to increase dramatically in the coming decades. The railroads are poised to take on this additional traffic assuming the capacity is available. Measuring the capacity of these rail lines is complicated by the interrelationships between asset utilization, reliability, and throughput. There is not a single metric that captures these intricacies. Capacity can be determined by delay-volume relationships, utility models, or economic study. For many case studies, railroads use parametric and simulation modeling to determine the train delay per 100 train miles. This metric does not tell the full story; especially when comparing different train types. The highway industry uses a different portfolio of metrics that can be adopted by railroad capacity planners. These metrics can be more sensitive to the worse performing trains. Additionally, these metrics can control for increased delay simply due to additional traffic. These concepts are illustrated by simulating the impact of additional 110 mph passenger service to a single track freight line.Copyright © 2012 by ASME
[1] Thomas Alvin White. Examination of Use of Delay as Standard Measurement of Railroad Capacity and Operation , 2006 .
[2] Mohd Rapik Saat,et al. Simulating the effects of higher speed passenger trains in single track freight networks , 2011, Proceedings of the 2011 Winter Simulation Conference (WSC).
[3] Robert E. Skinner. Cost-Effective Performance Measures for Travel Time Delay , Variation , and Reliability , 2003 .
[4] A M Khan. RAILWAY CAPACITY ANALYSIS AND RELATED METHODOLOGY , 1979 .