Determining Expected Startups of Generating Units by Frequency and Duration Approach
暂无分享,去创建一个
[1] C. Singh,et al. Operating Considerations in Generation Reliability Modeling-An Analytical Approach , 1981, IEEE Transactions on Power Apparatus and Systems.
[2] B. J. Cory,et al. An application of frequency and duration approach in generation planning , 1997 .
[3] Chris Marnay,et al. Evaluating dispatchability features in competitive bidding (in power systems) , 1992 .
[4] Roy Billinton,et al. Reliability evaluation of power systems , 1984 .
[5] Michael Grubb,et al. The Inclusion of Dynamic Factors in Statistical Power System Cost Models Part I: Assessment of Startup and Banking Costs , 1989, IEEE Power Engineering Review.
[6] S. N. Siddiqi,et al. Project valuation and power portfolio management in a competitive market , 2000 .
[7] A. J. Janssen. Operating considerations in reliability of modelling of wind-assisted utility systems , 1982 .