A Markov‐Based Road Maintenance Optimization Model Considering User Costs

This article describes how user costs of different maintenance actions need to be assessed in road maintenance as well as the maintenance costs. Vehicle operating costs (VOC) and travel delay cost are two major components of the user costs that are associated with road maintenance actions. The general calculation models of these two user cost components are simplified in this article. The article also develops a multiobjective Markov-based model to minimize both maintenance cost and user cost subject to a number of constraints including the average annual budget limit and the performance requirement. The road deterioration process is modeled as a discrete-time Markov process, and the states of road performance are defined in terms of the road roughness. The state transition probabilities are estimated considering the effects of deterioration and maintenance actions. An example is provided that illustrates the use of the proposed road maintenance optimization model. The results show that the optimal road maintenance plan obtained from the model is practical to implement and is cost-effective compared with the periodical road maintenance plan. The results presented in the article also indicate that the maintenance cost and the user cost are competitive. When maintenance works are carried out more frequently, the life-cycle maintenance costs will increase while the life-cycle user costs will decrease and this is because the VOC contributes the most amount of the user cost and its change has a contrary trend to the change of the maintenance cost over time.

[1]  S. Travis Waller,et al.  Optimal Long‐Term Infrastructure Maintenance Planning Accounting for Traffic Dynamics , 2009, Comput. Aided Civ. Infrastructure Eng..

[2]  Hui Gao,et al.  Road maintenance optimization through a discrete-time semi-Markov decision process , 2012, Reliab. Eng. Syst. Saf..

[3]  Hojjat Adeli,et al.  Object‐Oriented Model for Freeway Work Zone Capacity and Queue Delay Estimation , 2004 .

[4]  Adjo Amekudzi,et al.  Quality of Life, Sustainable Civil Infrastructure, and Sustainable Development: Strategically Expanding Choice , 2011 .

[5]  Han Zhang,et al.  Life-Cycle Optimization of Pavement Overlay Systems , 2010 .

[6]  Gregory A. Keoleian,et al.  Integrated Life-Cycle Assessment and Life-Cycle Cost Analysis Model for Concrete Bridge Deck Applications , 2008 .

[7]  Hui Gao,et al.  Optimal Performance‐Based Building Facility Management , 2010, Comput. Aided Civ. Infrastructure Eng..

[8]  Hojjat Adeli,et al.  Scheduling/Cost Optimization and Neural Dynamics Model for Construction , 1997 .

[9]  Hui Gao,et al.  Determining an Optimal Maintenance Period for Infrastructure Systems , 2012, Comput. Aided Civ. Infrastructure Eng..

[10]  Robert I. Carr CONSTRUCTION CONGESTION COST (CO3) BASIC MODEL , 2000 .

[11]  Hojjat Adeli,et al.  Sustainable Infrastructure Systems and Environmentally-Conscious Design—A View for the Next Decade , 2002 .

[12]  Joseph L. Schofer,et al.  Trend curve optimal control model for highway pavement maintenance: Case study and evaluation , 1994 .

[13]  Samer Madanat,et al.  A bottom-up solution for the multi-facility optimal pavement resurfacing problem , 2011 .

[14]  Elena López,et al.  Integration of Sustainability Issues in Strategic Transportation Planning: A Multi-criteria Model for the Assessment of Transport Infrastructure Plans , 2010, Comput. Aided Civ. Infrastructure Eng..

[15]  Y. Ouyang,et al.  Optimal scheduling of rehabilitation activities for multiple pavement facilities: exact and approximate solutions , 2004 .

[16]  Samer Madanat,et al.  Optimal Inspection and Maintenance Policies for Infrastructure Networks , 2000 .

[17]  Ganesh Thiagarajan,et al.  Parallelization strategies for element-by-element preconditioned conjugate gradient solver using high-performance Fortran for unstructured finite-element applications on linux clusters , 2002 .

[18]  Hojjat Adeli,et al.  Cost Optimization of Prestressed Concrete Bridges , 2005 .

[19]  Ralph Haas,et al.  Traffic Delay Cost Savings Associated with Trenchless Technology , 1999 .

[20]  Moshe Ben-Akiva,et al.  Modeling Infrastructure Performance and User Costs , 1995 .

[21]  Hojjat Adeli,et al.  Optimum cost design of reinforced concrete slabs using neural dynamics model , 2005, Eng. Appl. Artif. Intell..

[22]  Kamal Golabi,et al.  A Statewide Pavement Management System , 1982 .

[23]  Hojjat Adeli,et al.  Freeway Work Zone Traffic Delay and Cost Optimization Model , 2003 .

[24]  Susan L. Tighe,et al.  User cost savings in eliminating pavement excavations through employing trenchless technologies , 2002 .

[25]  Michael D. Lepech,et al.  Dynamic Life-Cycle Modeling of Pavement Overlay Systems: Capturing the Impacts of Users, Construction, and Roadway Deterioration , 2010 .

[26]  Christy Mihyeon Jeon,et al.  Addressing Sustainability in Transportation Systems: Definitions, Indicators, and Metrics , 2005 .