A classification scheme for project scheduling
暂无分享,去创建一个
Erik Demeulemeester | Bert De Reyck | Willy Herroelen | B. D. Reyck | W. Herroelen | Erik Demeulemeester
[1] Erik Demeulemeester,et al. Resource-constrained project scheduling: A survey of recent developments , 1998, Comput. Oper. Res..
[2] E.L. Lawler,et al. Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .
[3] Z Liu,et al. Scheduling Theory and its Applications , 1997 .
[4] Prabuddha De,et al. The discrete time-cost tradeoff problem revisited , 1995 .
[5] Gündüz Ulusoy,et al. A survey on the resource-constrained project scheduling problem , 1995 .
[6] Jacek Blazewicz,et al. Scheduling under resource constraints - deterministic models , 1986 .
[7] Robert C. Leachman. Multiple resource leveling in construction systems through variation of activity intensities , 1983 .
[8] Salah E. Elmaghraby,et al. Activity nets: A guided tour through some recent developments , 1995 .
[9] Joseph J. Moder,et al. Project Management With Cpm, Pert and Precedence Diagramming , 1983 .
[10] K. Neumann,et al. GERT networks and the time-oriented evaluation of projects , 1979 .
[11] Rainer Kolisch. Resource-Constrained Project Scheduling with Setup-Times , 1993 .
[12] J. D. Wiest,et al. A management guide to PERT/CPM: With GERT/PDM/DCPM and other networks , 1977 .
[13] Sooyoung Kim,et al. Resource-Constrained Scheduling of Projects with Variable-Intensity Activities , 1990 .
[14] Andreas Drexl,et al. Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application , 1997 .
[15] Avraham Shtub,et al. Project management: engineering, technology, and implementation , 1994 .
[16] Jan Węglarz,et al. A knowledge—based multiobjective project scheduling system , 1994 .
[17] Roman Słowiński,et al. DSS for multiobjective project scheduling , 1994 .
[18] Salah E. Elmaghraby,et al. Activity networks: Project planning and control by network models , 1977 .
[19] Peter Brucker,et al. Scheduling Algorithms , 1995 .
[20] William L. Maxwell,et al. Theory of scheduling , 1967 .
[21] Erik Demeulemeester,et al. Recent Advances in Branch-and-Bound Procedures for Resource-Constrained Project Scheduling Problems , 1992 .
[22] Jan Karel Lenstra,et al. Scheduling subject to resource constraints: classification and complexity , 1983, Discret. Appl. Math..
[23] Rainer Kolisch,et al. Project Scheduling under Resource Constraints , 1995 .
[24] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[25] A. A. Elimam,et al. Audit scheduling with overlapping activities and sequence-dependent setup costs , 1996 .
[26] Robert C. Leachman,et al. An aggregate model of project-oriented production , 1989, IEEE Trans. Syst. Man Cybern..
[27] R. Padman,et al. On modelling payments in projects , 1997 .
[28] Eugene L. Lawler,et al. Chapter 9 Sequencing and scheduling: Algorithms and complexity , 1993, Logistics of Production and Inventory.
[29] Graham K. Rand,et al. Logistics of Production and Inventory , 1995 .
[30] S. Selcuk Erenguc,et al. Project Scheduling Problems: A Survey , 1993 .
[31] Erik Demeulemeester,et al. Project network models with discounted cash flows a guided tour through recent developments , 1997, Eur. J. Oper. Res..