Precise and realistic utility functions for user-centric performance analysis of schedulers
暂无分享,去创建一个
[1] Uwe Schwiegelshohn,et al. Theory and Practice in Parallel Job Scheduling , 1997, JSSPP.
[2] Alvin AuYoung,et al. Service contracts and aggregate utility functions , 2006, 2006 15th IEEE International Conference on High Performance Distributed Computing.
[3] David E. Culler,et al. Market-based cluster resource management , 2001 .
[4] Richard Wolski,et al. Analyzing Market-Based Resource Allocation Strategies for the Computational Grid , 2001, Int. J. High Perform. Comput. Appl..
[5] Dror G. Feitelson,et al. Utilization, Predictability, Workloads, and User Runtime Estimates in Scheduling the IBM SP2 with Backfilling , 2001, IEEE Trans. Parallel Distributed Syst..
[6] Cynthia Bailey Lee,et al. Are User Runtime Estimates Inherently Inaccurate? , 2004, JSSPP.
[7] David E. Irwin,et al. Balancing risk and reward in a market-based task service , 2004, Proceedings. 13th IEEE International Symposium on High performance Distributed Computing, 2004..
[8] Bernardo A. Huberman,et al. Tycoon: A Market-Based Resource Allocation System , 2004, ArXiv.
[9] Adi Raveh,et al. Comparing Logs and Models of Parallel Workloads Using the Co-plot Method , 1999, JSSPP.
[10] David E. Culler,et al. User-Centric Performance Analysis of Market-Based Cluster Batch Schedulers , 2002, 2nd IEEE/ACM International Symposium on Cluster Computing and the Grid (CCGRID'02).
[11] Dan Tsafrir,et al. The Dynamics of Backfilling: Solving the Mystery of Why Increased Inaccuracy May Help , 2006, 2006 IEEE International Symposium on Workload Characterization.
[12] Cynthia Bailey Lee,et al. On the User–Scheduler Dialogue: Studies of User-Provided Runtime Estimates and Utility Functions , 2006, Int. J. High Perform. Comput. Appl..
[13] Warren Smith,et al. Benchmarks and Standards for the Evaluation of Parallel Job Schedulers , 1999, JSSPP.
[14] Dan Tsafrir,et al. Instability in parallel job scheduling simulation: the role of workload flurries , 2006, Proceedings 20th IEEE International Parallel & Distributed Processing Symposium.
[15] Hussein M. Abdel-Wahab,et al. A Microeconomic Scheduler for Parallel Computers , 1995, JSSPP.
[16] Chaki Ng,et al. Mirage: a microeconomic resource allocation system for sensornet testbeds , 2005, The Second IEEE Workshop on Embedded Networked Sensors, 2005. EmNetS-II..
[17] Richard Wolski,et al. Predicting Bounds on Queuing Delay in Space-shared Computing Environments , 2006, 2006 IEEE International Symposium on Workload Characterization.
[18] Allan Snavely,et al. Symbiotic Space-Sharing on SDSC's DataStar System , 2006, JSSPP.
[19] Dmitry N. Zotkin,et al. Job-length estimation and performance in backfilling schedulers , 1999, Proceedings. The Eighth International Symposium on High Performance Distributed Computing (Cat. No.99TH8469).
[20] Peter Norvig,et al. Artificial Intelligence: A Modern Approach , 1995 .
[21] Tad Hogg,et al. Spawn: A Distributed Computational Economy , 1992, IEEE Trans. Software Eng..
[22] Larry Rudolph,et al. Towards Convergence in Job Schedulers for Parallel Supercomputers , 1996, JSSPP.