Failure models and throughput rate of transfer lines
暂无分享,去创建一个
[1] Baris Tan. Production control of a pull system with production and demand uncertainty , 2002, IEEE Trans. Autom. Control..
[2] Xiaolan Xie,et al. Derivative Estimation for Buffer Capacity of Continuous Transfer Lines Subject to Operation-Dependent Failures , 2002, Discret. Event Dyn. Syst..
[3] Xiaolan Xie,et al. Optimal discrete-flow control of a single-stage failure-prone manufacturing system , 2003, 42nd IEEE International Conference on Decision and Control (IEEE Cat. No.03CH37475).
[4] J. A. Buzacott,et al. Models of automatic transfer lines with inventory banks a review and comparison , 1978 .
[5] R. David,et al. A study of the continuous flow model of production lines with unreliable machines and finite buffers , 1994 .
[6] Yves Dallery,et al. An improved decomposition method for the analysis of production lines with unreliable machines and finite buffers , 1999 .
[7] Xiaolan Xie. PERFORMANCE ANALYSIS OF A TRANSFER LINE WITH UNRELIABLE MACHINES AND FINITE BUFFERS , 1993 .
[8] Xiaolan Xie. Hierarchical production control of a flexible manufacturing system , 1991 .
[9] Stanley B. Gershwin,et al. An algorithm for the computer control of a flexible manufacturing system , 1983 .
[10] Rajan Suri,et al. On using continuous flow lines to model discrete production lines , 1994, Discret. Event Dyn. Syst..
[11] Xiaolan Xie. Evaluation and Optimization of Two-Stage Continuous Transfer Lines Subject to Time-Dependent Failures , 2002, Discret. Event Dyn. Syst..
[12] Jianqiang Hu,et al. Structural properties of optimal production controllers in failure-prone manufacturing systems , 1994, IEEE Trans. Autom. Control..
[13] Yves Dallery,et al. Properties of Continous Models of Transfer Lines with Unreliable Machines and Finite Buffers , 1989 .
[14] Youxian Sun,et al. Optimal hedging point control for a failure-prone manufacturing system , 2001, Int. J. Syst. Sci..
[15] Leyuan Shi,et al. Analysis of Departure Times in Discrete and Continuous Tandem Production Lines , 2002, Discret. Event Dyn. Syst..
[16] Edward L. Robertson,et al. Properties of Conflict-Free and Persistent Petri Nets , 1978, JACM.
[17] René David,et al. Petri nets and grafcet - tools for modelling discrete event systems , 1992 .
[18] Mehmet Savsar. Stochastic modelling of an integrated pulp and paper factory with intermediate storage , 1996, Int. J. Syst. Sci..
[19] Andrea Matta,et al. Performance evaluation of continuous production lines with machines having different processing times and multiple failure modes , 2003, Perform. Evaluation.
[20] R. Akella,et al. Optimal control of production rate in a failure prone manufacturing system , 1985, 1985 24th IEEE Conference on Decision and Control.
[21] Stanley Gershwin,et al. An algorithm for the computer control of production in a flexible manufacturing system , 1981, 1981 20th IEEE Conference on Decision and Control including the Symposium on Adaptive Processes.
[22] Xiaolan Xie,et al. Approximate analysis of transfer lines with unreliable machines and finite buffers , 1989 .