Method for quickly tunneling mine roadway and consecutively timbering mine roadway

The present invention relates to a method of coal mine roadway excavation rapidly continuous support operations, which can effectively solve the construction speed roadway excavation and supporting staggered caused not simply raise the question that addresses the technical solution is, 1) tunnel fully mechanized drifting or gun boring feet, the refuse, the drilling anchor; 2) topping drilling anchor; 3) help anchor the drilling; 4) out of gangue: roadway when using mechanized digging above 1), 3) step may be performed simultaneously; roadway employed when Excavating after blasting the refuse and the drilling of the new borehole in 1), 2), 3) concurrently with the above steps, the operation method of the present invention is simple, excavation and support at the same time, improving the driving speed, simplified supporting process, shortening the initial roof support time, enhance the stability of the roof, while reducing the strength of the construction, effectively increasing the speed of roadway construction, cost savings, the use of effective, innovative and supporting on the boring operation method.