Note on "replenishment run time problem with machine breakdown and failure in rework"
暂无分享,去创建一个
[1] A. Seidmann,et al. Production lot sizing with machine breakdowns , 1992 .
[2] Manoj Kumar Tiwari,et al. An integrated approach for logistic and vendor managed inventory in supply chain , 2010, Expert Syst. Appl..
[3] Chung-Ho Chen,et al. Optimum profit model based on order quantity, product price, and process quality level , 2011, Expert Syst. Appl..
[4] Hong-Dar Lin,et al. Mathematical modeling for solving manufacturing run time problem with defective rate and random machine breakdown , 2011, Comput. Ind. Eng..
[5] Frederick S. Hillier,et al. Introduction of Operations Research , 1967 .
[6] Meir J. Rosenblatt,et al. Economic Production Cycles with Imperfect Production Processes , 1986 .
[7] Hong-Dar Lin,et al. Numerical method for determination of the optimal lot size for a manufacturing system with discontinuous issuing policy and rework , 2011 .
[8] Singa Wang Chiu,et al. Alternative approach for solving replenishment lot size problem with discontinuous issuing policy and rework , 2012, Expert Syst. Appl..
[9] Yuan-Shyi Peter Chiu,et al. Replenishment run time problem with machine breakdown and failure in rework , 2012, Expert Syst. Appl..
[10] Gour Chandra Mahata,et al. An EPQ-based inventory model for exponentially deteriorating items under retailer partial trade credit policy in supply chain , 2012, Expert Syst. Appl..
[11] Heinrich Kuhn,et al. A dynamic lot sizing model with exponential machine breakdowns , 1997, Eur. J. Oper. Res..