Gas Control Technology under Unstable Disturbance Stress
暂无分享,去创建一个
Gang Wang | Lu Lu Sun | Wei Min Cheng | Hong Yuan Qu | G. Wang | L. Sun | Weimin Cheng | H. Qu
[1] Application of High Efficient Gas Drainage Technology with Double Casing Pipe to Mining Seam , 2013 .
[2] Jiang Chenglin. Study on Borehole Pressurized Sealing Technology for Gas Drainage Borehole in Mining Seam , 2011 .
[3] Xiong Zhen-hua. Numerical simulation of small pillar stress concentration areas borehole pressure relief effect , 2009 .
[4] Wang Yi-tai. Mechanism of Narrow Pillar Protecting Roadway and Support Technology of Gob-Side Entry in Deep Mine , 2009 .
[5] Chang Ju-cai. Influenced of coal pillar width on deformation and fracture of gateway surrounding rocks in fully mechanized top-coal caving mining , 2007 .
[6] Xie Pin-zhou. Study on Failure Regularity and Reasonable Dimension of District Sublevel Small Coal Pillar , 2007 .
[7] Sun Bing-bing. Research on Stability of Gob-Side Entry with Small Coal Pillar on Insular Face , 2006 .
[8] Liu Weiqun. Analysis on shearing deformation of roof support bolt in gob-side entry of fully-mechanized caving face , 2005 .
[9] Wang Wei. Analysis of the relationship between abutment pressure distribution and floor heave of gateway , 2002 .
[10] Li Xue-hu. Rational Position Determination of Roadway Driving Along Next Goaf for Fully-Mechanized Top-Coal Caving Mining , 2000 .