Maintenance plan for a fleet of rotary drill rigs

In this paper a basic methodology was used for the reliability modeling and developing a maintenance program for a fleet of four drilling rigs. Failure and performance data was collected from Sarcheshmeh Copper Mine in Iran for a two-year period. Then the available data was classified and analyzed and reliability of all subsystems and whole rigs were modeled and studied. The failure data showed that, in all rigs, electrical, hydraulic and drilling systems are the most frequent failing subsystems of the machine. The reliability analysis showed that transmission system is the most reliable subsystem in all studied rigs. In order to calculate the reliability of whole fleet, it was assumed that operation of at least two drilling rigs is essential for satisfying the production goals. Therefore, probabilistic possibility of all fleet’s states were calculated. In this paper, 80% is selected as the desired level of reliability for developing of preventive maintenance program for each subsystem of the drilling rigs. Finally, the practical approaches were suggested for improving the maintenance operation and productivity of the studied fleet.

[1]  Uday Kumar,et al.  Reliability analysis of hydraulic systems of LHD machines using the power law process model , 1992 .

[2]  Mustafa Kumral,et al.  Reliability-based optimisation of a mine production system using genetic algorithms , 2005 .

[3]  Ataei Mohammad,et al.  Reliability and maintainability analysis of electrical system of drum shearers , 2011 .

[4]  Ataie Mohammad,et al.  Reliability modeling of hydraulic system of drum shearer machine , 2011 .

[5]  Marvin Rausand,et al.  System Reliability Theory: Models, Statistical Methods, and Applications , 2003 .

[6]  Jayanta Bhattacharya,et al.  Replacement and maintenance analysis of longwall shearer using fault tree technique , 2006 .

[7]  V. I. Ivko,et al.  A method of estimating the operational reliability of kinematic mechanized support systems , 1973 .

[8]  Uday Kumar,et al.  Reliability-based maintenance scheduling of haulage system of drum shearer , 2011 .

[9]  Ying-Shen Juang,et al.  A knowledge management system for series-parallel availability optimization and design , 2008, Expert Syst. Appl..

[10]  Uday Kumar,et al.  Reliability Modeling of Water System of Longwall Shearer Machine , 2011 .

[11]  R. A. Hall,et al.  Reliability and maintainability models for mobile underground haulage equipment , 2003 .

[12]  Uday Kumar,et al.  Goodness-of-fit tests for the power-law process based on the TTT-plot , 1992 .

[13]  Uday Kumar,et al.  Reliability analysis of power transmission cables of electric mine loaders using the proportional hazards model , 1992 .

[14]  Mohammad Modarres Risk Analysis in Engineering : Techniques, Tools, and Trends , 2016 .

[15]  Uday Kumar,et al.  Reliability analysis of the cable system of drum shearer using the power law process model , 2012 .

[16]  Mohammad Javad Rahimdel,et al.  Reliability Analysis of Drilling Operation in Open Pit Mines , 2013 .

[17]  Bhalchandra V. Gokhale,et al.  Rotary Drilling and Blasting in Large Surface Mines , 2010 .

[18]  Jayanta Bhattacharya,et al.  Reliability Analysis of a conveyor system using hybrid data , 2007, Qual. Reliab. Eng. Int..

[19]  S. F. Forouhandeh,et al.  Reliability estimation of auxiliary ventilation systems in long tunnels during construction , 2011 .