Nonlinear approach for short-term scheduling of a head-sensitive hydro chain

In a competitive electricity market, generation companies have to maximize their profits selecting the best strategy. This paper is on the problem of short-term hydro scheduling, particularly concerning a head-sensitive hydro chain. We propose a method based on nonlinear programming that considers power generation a function of water discharge and also of the head. The proposed method provides a higher profit for the company in comparison with classical optimization methods based on linear programming that ignores head dependence. Numerical results based on a realistic cascaded hydro chain show that this method is adequate for dealing with head-sensitive hydro chains.

[1]  J. Contreras,et al.  Forecasting next-day electricity prices by time series models , 2002 .

[2]  J. Barquin,et al.  Under-relaxed iterative procedure for feasible short-term scheduling of a hydro chain , 2003, 2003 IEEE Bologna Power Tech Conference Proceedings,.

[3]  R.-H. Liang,et al.  Short-term hydro-scheduling using Hopfield neural network , 1996 .

[4]  T. Dillon,et al.  Optimal Operations Planning in a Large Hydro-Thermal Power System , 1983, IEEE Transactions on Power Apparatus and Systems.

[5]  J. Waight,et al.  Experiences with Mixed Integer Linear Programming-Based Approaches in Short-Term Hydro Scheduling , 2001, IEEE Power Engineering Review.

[6]  P. Leite,et al.  Energetic Operation Planning Using Genetic Algorithms , 2001, IEEE Power Engineering Review.

[7]  Xiaohong Guan,et al.  Scheduling hydro power systems with restricted operating zones and discharge ramping constraints , 1999 .

[8]  J. Garcia-Gonzalez,et al.  Short-term hydro scheduling with cascaded and head-dependent reservoirs based on mixed-integer linear programming , 2001, 2001 IEEE Porto Power Tech Proceedings (Cat. No.01EX502).

[9]  Secundino Soares,et al.  Short term hydroelectric scheduling combining network flow and interior point approaches , 2005 .

[10]  O. Nilsson,et al.  Mixed-integer programming applied to short-term planning of a hydro-thermal system , 1995 .

[11]  P. Lautala,et al.  A short-term scheduling for a hydropower plant chain , 1998 .

[12]  M. Aganagic,et al.  Short-term hydro generation and interchange contract scheduling for Swiss Rail , 1995 .

[13]  Secundino Soares,et al.  A network flow model for short-term hydro-dominated hydrothermal scheduling problems , 1994 .

[14]  Antonio J. Conejo,et al.  Self-Scheduling of a Hydro Producer in a Pool-Based Electricity Market , 2002, IEEE Power Engineering Review.

[15]  Allen J. Wood,et al.  Power Generation, Operation, and Control , 1984 .

[16]  Hong-Chan Chang,et al.  Genetic aided scheduling of hydraulically coupled plants in hydro-thermal coordination , 1996 .

[17]  Luís Ferreira,et al.  Short-term resource scheduling in multi-area hydrothermal power systems , 1989 .

[18]  M. Piekutowski,et al.  Optimal short-term scheduling for a large-scale cascaded hydro system , 1993 .

[19]  T. Dillon,et al.  Electricity price short-term forecasting using artificial neural networks , 1999 .

[20]  A.I. Cohen,et al.  Optimization-based methods for operations scheduling , 1987, Proceedings of the IEEE.

[21]  Egill Benedikt Hreinsson Optimal short term operation of a purely hydroelectric system , 1988 .

[22]  Xiaohong Guan,et al.  Scheduling hydrothermal power systems with cascaded and head-dependent reservoirs , 1999 .