Models for integrated resource and operation scheduling
暂无分享,去创建一个
[1] Dailun Shi,et al. Flow Shop Scheduling with Partial Resource Flexibility , 2004, Manag. Sci..
[2] Zhi-Long Chen,et al. Simultaneous Job Scheduling and Resource Allocation on Parallel Machines , 2004, Ann. Oper. Res..
[3] L. Puigjaner,et al. Method to incorporate energy integration considerations in multiproduct batch processes , 1994 .
[4] Nilay Shah,et al. Production planning for the rational use of energy in multiproduct continuous plants , 1993 .
[5] Chi Wai Hui,et al. Total-site scheduling for better energy utilization , 2004 .
[6] François Soumis,et al. Hierarchical Approach to Steel Production Scheduling Under a Global Energy Constraint , 1988 .
[7] Ignacio E. Grossmann,et al. Assignment and sequencing models for thescheduling of process systems , 1998, Ann. Oper. Res..
[8] J. Korhonen,et al. A material and energy flow model for co-production of heat and power , 2002 .
[9] Joseph B. Mazzola,et al. Scheduling Parallel Manufacturing Cells with Resource Flexibility , 1996 .
[10] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[11] Joseph B. Mazzola,et al. Flow Shop Scheduling with Resource Flexibility , 1994, Oper. Res..
[12] Jean-François Cordeau,et al. A computational study of Benders decomposition for the integrated aircraft routing and crew scheduling problem , 2003, Comput. Oper. Res..