Efficient aircraft spare parts inventory management under demand uncertainty

In airline industries, the aircraft maintenance cost takes up about 13% of the total operating cost. It can be reduced by a good planning. Spare parts inventories exist to serve the maintenance planning. Compared with commonly used reorder point system (ROP) and forecasting methods which only consider historical data, this paper presents two non-linear programming models which predict impending demands based on installed parts failure distribution. The optimal order time and order quantity can be found by minimizing total cost. The first basic mathematical model assumes shortage period starts from mean time to failure (MTTF). An iteration method and GAMS are used to solve this model. The second improved mathematical model takes into account accurate shortage time. Due to its complexity, only GAMS is applied in solution methodology. Both models can be proved effective in cost reduction through revised numerical examples and their results. Comparisons of the two models are also discussed.

[1]  Matthieu van der Heijden,et al.  Availability of k-out-of-N systems under block replacement sharing limited spares and repair capacity , 2007 .

[2]  Kai Virtanen,et al.  A Simulation Model for Military Aircraft Maintenance and Availability , 2001 .

[3]  Jacques A. Ferland,et al.  Allotment of aircraft spare parts using genetic alorithms , 2003 .

[4]  Timothy S. Vaughan,et al.  Production , Manufacturing and Logistics Failure replacement and preventive maintenance spare parts ordering policy , 2004 .

[5]  Mauro Gamberi,et al.  Managing Lumpy Demand for Aircraft Spare Parts , 2005 .

[6]  M.J. Roemer,et al.  Prognostic enhancements to diagnostic systems for improved condition-based maintenance [military aircraft] , 2002, Proceedings, IEEE Aerospace Conference.

[7]  Adel A. Ghobbar,et al.  Evaluation of forecasting methods for intermittent parts demand in the field of aviation: a predictive model , 2003, Comput. Oper. Res..

[8]  Wenbin Wang,et al.  A stochastic model for joint spare parts inventory and planned maintenance optimisation , 2012, Eur. J. Oper. Res..

[9]  Adel A. Ghobbar,et al.  Sources of intermittent demand for aircraft spare parts within airline operations , 2002 .

[10]  Ananth V. Iyer,et al.  Efficient Supply Chain Management at the U.S. Coast Guard Using Part-Age Dependent Supply Replenishment Policies , 2006, Oper. Res..

[11]  Adel A. Ghobbar,et al.  The material requirements planning system for aircraft maintenance and inventory control: a note , 2004 .

[12]  Anthony Muchiri,et al.  Optimizing Aircraft Line Maintenance Through Task Re-Clustering and Interval De-Escalation , 2011 .

[13]  Stephen G. Allen,et al.  An Ordering Policy for Repairable Stock Items , 1968, Oper. Res..

[14]  Emre Kiyak The Effects of Aircraft Preventive Maintenance on Reliability , 2012 .

[15]  R. Natarajan A Reliability Problem with Spares and Multiple Repair Facilities , 1968, Oper. Res..

[16]  Derek Atkins,et al.  Joint optimization of maintenance and inventory policies for a simple system , 1996 .