부두 입출항 선박을 위한 선회수역 크기에 관한 고찰
暂无分享,去创建一个
Generally the determination of turning basin for vessels of entering & sailing in the berth has been considered in the design standard of harbor construction rules of the port. In this regard, the turning basin has been determined by the max size of entering vessel of the berth/port. But the size of turning basin may considered the ship’s maneuvering ability, operator’s skillful power, mooring equipments of the berth, arrangement of the fairway and the environment condition of weather & seas around the designated port area. So this paper suggested the optimum size of turning basin after studying the harbour design rules of the advanced marine countries and using by maneuvering simulator for turning basin size and also evaluated the design standard of harbor construction rules and minimum size of turning basin against ship’s length at the Gangjung civil/naval port of Jeju Island.