Abstract The paper considers an economic manufacturing quantity problem for an unreliable manufacturing system where the machine is subject to random failure and at most two failures can occur in a production cycle. Upon first failure, the repair action is started immediately and the demand is met first from the on-hand inventory. The shortages, if occur due to longer repair time, are backlogged partially by resuming the production run after machine repair. While backlogging, if failure occurs again then the accumulated shortages until completion of the second repair are assumed to be lost. The model is formulated under general failure and general repair time distributions. Some characteristics of the model with exponential failure and exponential/constant repair times are studied. The optimal lot sizing policies are derived and the sensitivity of some model parameters is examined with the help of numerical examples.

[1]  Nadim E. Abboud A simple approximation of the EMQ model with Poisson machine failures , 1997 .

[2]  A. Seidmann,et al.  Production lot sizing with machine breakdowns , 1992 .

[3]  Tadashi Dohi,et al.  Optimal lot sizing for an unreliable production system based on net present value approach , 2004 .

[4]  M. J. M. Posner,et al.  Analysis of a production-inventory system with unreliable production facility , 1989 .

[5]  Stephen Wolfram,et al.  The Mathematica Book , 1996 .

[6]  Steven Nahmias,et al.  Production and operations analysis , 1992 .

[7]  Tadashi Dohi,et al.  The Optimal Lot Sizing for Unreliable Economic Manufacturing Model , 1997 .

[8]  Kun-Jen Chung,et al.  Approximations to production lot sizing with machine breakdowns , 2003, Comput. Oper. Res..

[9]  Viliam Makis,et al.  An EMQ model with inspections and random machine failures , 1998, J. Oper. Res. Soc..

[10]  Sheldon M. Ross Introduction to Probability Models. , 1995 .

[11]  Tadashi Dohi,et al.  Optimal control of preventive maintenance schedule and safety stocks in an unreliable manufacturing environment , 2001 .

[12]  Wallace J. Hopp,et al.  Optimal inventory control in a production flow system with failures , 1989 .

[13]  Sheldon M. Ross,et al.  Introduction to probability models , 1975 .

[14]  Morton J. M. Posner,et al.  Production-Inventory Systems with Unreliable Machines , 1994, Oper. Res..

[15]  David F. Pyke,et al.  Inventory management and production planning and scheduling , 1998 .

[16]  Kun-Jen Chung Bounds for production lot sizing with machine breakdowns , 1997 .

[17]  Panganamala Ramana Kumar,et al.  Optimality of Zero-Inventory Policies for Unreliable Manufacturing Systems , 1988, Oper. Res..

[18]  Chang Hyun Kim,et al.  An extended EMQ model for a failure prone machine with general lifetime distribution , 1997 .

[19]  Chang Hyun Kim,et al.  An extended optimal lot sizing model with an unreliable machine , 1997 .

[20]  D. N. P. Murthy,et al.  Optimal lot sizing with unreliable production system , 2000 .

[21]  N. E. Abboud A discrete-time Markov production-inventory model with machine breakdowns , 2001 .

[22]  Liliane Pintelon,et al.  Production Batching with Machine Breakdowns and Safety Stocks , 1992, Oper. Res..