Design of an Infrastructure Project Using a Point-Based Methodology
暂无分享,去创建一个
[1] Bozidar Stojadinovic,et al. Set-Based Design: Case Study on Innovative Hospital Design , 2008 .
[2] Ian F. C. Smith,et al. Constraint-Based Support for Collaboration in Design and Construction , 1999 .
[3] Durward K. Sobek,et al. The Second Toyota Paradox: How Delaying Decisions Can Make Better Cars Faster , 1995 .
[4] Iris D. Tommelein,et al. Integrating design planning, schedule and control with Deplan , 2000 .
[5] Glenn Ballard,et al. Rethinking Project Definition in Terms of Target Costing , 2006 .
[6] Iris D. Tommelein,et al. DePlan: a tool for integrated design management , 2004 .
[7] Andrew Y. C. Nee,et al. Function-based design synthesis approach to design reuse , 2006 .
[8] Stephen Emmitt,et al. Implementing Value Through Lean Design Management , 2004 .
[9] Lauri Koskela,et al. Design management in building construction: from theory to practice , 2002 .
[10] Peter DeGrace,et al. Wicked problems, righteous solutions , 1990 .
[11] Glenn Ballard,et al. OVERCOMING THE HURDLE OF FIRST COST: ACTION RESEARCH IN TARGET COSTING , 2009 .
[12] Douglas Frantz. From the Ground Up: The Business of Building in the Age of Money , 1991 .
[13] Sten Bonke,et al. Facilitating Client Value Creation in the Conceptual Design Phase of Construction Projects: A Workshop Approach , 2010 .
[14] Nuno António,et al. Product-Process Development Simulation to Support Specialty Contractor Involvement in Early Design , 2001 .
[15] Lauri Koskela,et al. Towards Lean Design Management , 1997 .
[16] Durward K. Sobek,et al. Involving suppliers in product development in the United States and Japan: evidence for set-based concurrent engineering , 1996 .
[17] Robert Lane,et al. “Wicked Problems, Righteous Solutions” Back to the Future on Large Complex Projects , 2000 .
[18] Glenn Ballard,et al. Positive Vs. Negative Iteration in Design , 2000 .
[19] Stephen Emmitt,et al. Design Team Communication and Design Task Complexity: The Preference for Dialogues , 2008 .
[20] Iris D. Tommelein,et al. Design Structure Matrix Implementation on a Seismic Retrofit , 2010 .
[21] Iris D. Tommelein,et al. Lean Design Management in an Infrastructure Design-Build Project: A Case Study , 2010 .
[22] B. Flyvbjerg. Five Misunderstandings About Case-Study Research , 2006, 1304.1186.
[23] Iris D. Tommelein,et al. Contributors to lead time in construction supply chains: case of pipe supports used in power plants , 2002, Proceedings of the Winter Simulation Conference.
[24] Rajesh Jugulum,et al. Theory of Inventive Problem Solving (TRIZ) , 2008 .
[25] Iris D. Tommelein,et al. Product modeling to support case-based construction planning and scheduling , 2004 .
[26] Iris D. Tommelein,et al. SightPlan Experiments: Alternate Strategies for Site Layout Design , 1991 .
[27] Brian K Adams,et al. Guideway Design and Construction , 2009 .
[28] Lauri Koskela,et al. On the Agenda of Design Management Research , 1998 .
[29] Andrew Davies,et al. Innovation in Megaprojects: Systems Integration at London Heathrow Terminal 5 , 2009 .
[30] Nuno Gil,et al. Design Reuse and Buffers in High-Tech Infrastructure Development: A Stakeholder Perspective , 2007, IEEE Transactions on Engineering Management.
[31] Iris D. Tommelein,et al. Exploration of Set-Based Design for Reinforced Concrete Structures , 2007 .
[32] Stephen Emmitt,et al. The Value Universe: Defining a Value Based Approach to Lean Construction , 2005 .
[33] Jeffrey K. Liker,et al. The Toyota way : 14 management principles from the world's greatest manufacturer , 2004 .