The NBI control system for the TJ-II
暂无分享,去创建一个
F. Lapayese | G. Marcon | G. Wolfers | A. de la Peña | Luis F. Pacios | R. Carrasco | M. Liniers | Javier A. Alonso | C. Fuentes
[1] V. Krivenski,et al. TJ-II Project: A Flexible Heliac Stellarator , 1990 .
[2] M. Blaumoser,et al. Control system for the Spanish Stellarator TJ-II , 1995 .
[3] J. Botija,et al. TJ-II neutral beam injectors control and data acquisition system , 2001 .
[4] L. Pacios,et al. A versatile Timing System based on OS9 for the Spanish stellarator TJ-II , 1995, Proceedings of 16th International Symposium on Fusion Engineering.