Multi-criteria decision making support tools for maintenance of marine machinery systems
暂无分享,去创建一个
[1] J. Moubray. Reliability-Centered Maintenance , 1991 .
[2] Marcello Braglia,et al. The analytic hierarchy process applied to maintenance strategy selection , 2000, Reliab. Eng. Syst. Saf..
[3] Charles E Ebeling,et al. An Introduction to Reliability and Maintainability Engineering , 1996 .
[4] Gionata Carmignani,et al. An integrated structural framework to cost-based FMECA: The priority-cost FMECA , 2009, Reliab. Eng. Syst. Saf..
[5] Y. Ilker Topcu,et al. Risk-based preventive maintenance planning using Failure Mode and Effect Analysis (FMEA) for marine engine systems , 2010, 2010 Second International Conference on Engineering System Management and Applications.
[6] Violetta Cavalli-Sforza,et al. Delphi Forecasts of Land Use: Transportation Interactions , 1984 .
[7] R. C. Abeyaratne,et al. A new application of ELECTRE III and revised Simos' procedure for group material selection under weighting uncertainty , 2008, Knowl. Based Syst..
[8] Jack A. Neal,et al. Identifying baseline food safety training practices for retail delis using the Delphi expert consensus method , 2013 .
[9] R. Venkata Rao,et al. A decision making methodology for material selection using an improved compromise ranking method , 2008 .
[10] M. Ilangkumaran,et al. Selection of maintenance policy for textile industry using hybrid multi‐criteria decision making approach , 2009 .
[11] Shahrul Kamaruddin,et al. An overview of time-based and condition-based maintenance in industrial application , 2012, Comput. Ind. Eng..
[12] Wenbin Wang,et al. Subjective estimation of the delay time distribution in maintenance modelling , 1997 .
[13] J Maiti,et al. Risk-based maintenance--techniques and applications. , 2007, Journal of hazardous materials.
[14] Kazuo Hatakeyama,et al. Analysis of the fall of TPM in companies , 2006 .
[15] Shun-Peng Zhu,et al. Risk evaluation in failure mode and effects analysis of aircraft turbine rotor blades using Dempster–Shafer evidence theory under uncertainty , 2011 .
[16] Hong-Bae Jun,et al. On condition based maintenance policy , 2015, J. Comput. Des. Eng..
[17] Mincheol Kim,et al. Application of Delphi-AHP methods to select the priorities of WEEE for recycling in a waste management decision-making tool. , 2013, Journal of environmental management.
[18] Antonio Scipioni,et al. FMEA methodology design, implementation and integration with HACCP system in a food company , 2002 .
[19] L. Pintelon,et al. A framework for maintenance concept development , 2002 .
[20] L. Anojkumar,et al. Comparative analysis of MCDM methods for pipe material selection in sugar industry , 2014, Expert Syst. Appl..
[21] Ching-Lai Hwang,et al. Multiple attribute decision making : an introduction , 1995 .
[22] M. Sayadi,et al. Extension of VIKOR method for decision making problem with interval numbers , 2009 .
[23] Behrooz Karimi,et al. Deriving preference order of open pit mines equipment through MADM methods: Application of modified VIKOR method , 2011, Expert Syst. Appl..
[24] J. Moubray. Reliability-centred maintenance , 1995 .
[25] Adiel Teixeira de Almeida,et al. Decision theory in maintenance strategy of standby system with gamma-distribution repair-time , 1996, IEEE Trans. Reliab..
[26] Per Hokstad,et al. An overall model for maintenance optimization , 1996 .
[27] Iraklis Lazakis,et al. Determination of the optimum ship maintenance strategy through multi attribute decision making , 2012 .
[28] Terje Aven,et al. A framework for reliability and risk centered maintenance , 2011, Reliab. Eng. Syst. Saf..
[29] Dong-Hyun Jee,et al. A method for optimal material selection aided with decision making theory , 2000 .
[30] C. Romero,et al. Making Sustainability Rankings Using Compromise Programming. An Application to European Paper Industry , 2011 .
[31] A. Kobi,et al. A multicriteria failure mode and effects analysis approach for optimizing human safety , 2013, 2013 Proceedings Annual Reliability and Maintainability Symposium (RAMS).
[32] John W. H. Price,et al. The constant‐interval replacement model for preventive maintenance , 2000 .
[33] Jiajia Jing,et al. Parameter Estimation of a Delay Time Model of Wearing Parts Based on Objective Data , 2015 .
[34] Jari Halme,et al. Fault tree analysis for maintenance needs , 2012 .
[35] John Crocker,et al. Age-related maintenance versus reliability centred maintenance: a case study on aero-engines , 2000, Reliab. Eng. Syst. Saf..
[36] Marcello Braglia,et al. MAFMA: multi‐attribute failure mode analysis , 2000 .
[37] Bijan Sarkar,et al. THE MAINTENANCE STRATEGY SELECTION OF A GAS TURBINE POWER PLANT SYSTEM , 2011 .
[38] Wenbin Wang,et al. A multi-component and multi-failure mode inspection model based on the delay time concept , 2010, Reliab. Eng. Syst. Saf..
[39] Yong Deng,et al. An improved method for risk evaluation in failure modes and effects analysis of aircraft engine rotor blades , 2012 .
[40] Ulrich Hauptmanns. Semi-quantitative fault tree analysis for process plant safety using frequency and probability ranges , 2004 .
[41] Hongzhou Wang,et al. A survey of maintenance policies of deteriorating systems , 2002, Eur. J. Oper. Res..
[42] Wei Wu,et al. Development of a risk-based maintenance strategy using FMEA for a continuous catalytic reforming plant , 2012 .
[43] W. Wang,et al. An empirical Bayesian based approach to delay time inspection model parameters estimation using both subjective and objective data , 2007, Qual. Reliab. Eng. Int..
[44] Hossam A. Gabbar,et al. Computer-aided RCM-based plant maintenance management system , 2003 .
[45] Xinping Yan,et al. Marine Propulsion System Reliability Research Based on Fault Tree Analysis , 2013 .
[46] Jian-Bo Yang,et al. Failure mode and effects analysis by data envelopment analysis , 2009, Decis. Support Syst..
[47] Yongtae Park,et al. A systematic approach for diagnosing service failure: Service-specific FMEA and grey relational analysis approach , 2011, Math. Comput. Model..
[48] Gwo-Hshiung Tzeng,et al. The best vendor selection for conducting the recycled material based on a hybrid MCDM model combining DANP with VIKOR , 2012 .
[49] Faisal Khan,et al. Risk-based maintenance (RBM): a quantitative approach for maintenance/inspection scheduling and planning , 2003 .
[50] P. O'Connor,et al. Practical Reliability Engineering , 1981 .
[51] S. M. Sapuan,et al. Material selection based on ordinal data , 2010 .
[52] Jin Wang,et al. Modified failure mode and effects analysis using approximate reasoning , 2003, Reliab. Eng. Syst. Saf..
[53] Liliane Pintelon,et al. Maintenance concept development: A case study , 2004 .
[54] Gwo-Hshiung Tzeng,et al. Comparison among three analytical methods for knowledge communities group-decision analysis , 2007, Expert Syst. Appl..
[55] E. Lorna Wong,et al. Proportional hazards modeling of engine failures in military vehicles , 2010 .
[56] Ching-Lai Hwang,et al. Fuzzy Multiple Attribute Decision Making - Methods and Applications , 1992, Lecture Notes in Economics and Mathematical Systems.
[57] Anish Sachdeva,et al. Maintenance criticality analysis using TOPSIS , 2009, 2009 IEEE International Conference on Industrial Engineering and Engineering Management.
[58] Mario T. Tabucanon,et al. A multicriteria approach to the selection of preventive maintenance intervals , 1997 .
[59] Marley M. B. R. Vellasco,et al. PROMETHEE and Fuzzy PROMETHEE Multicriteria Methods for Ranking Equipment Failure Modes , 2009, 2009 15th International Conference on Intelligent System Applications to Power Systems.
[60] Antonio Casimiro Caputo,et al. AHP-based methodology for selecting safety devices of industrial machinery , 2013 .
[61] Narasimha Bolloju,et al. Aggregation of analytic hierarchy process models based on similarities in decision makers' preferences , 2001, Eur. J. Oper. Res..
[62] Metin Celik,et al. Application of failure modes and effects analysis to main engine crankcase explosion failure on-board ship , 2013 .
[63] A. J. Mokashi,et al. A study of reliability-centred maintenance in maritime operations , 2002 .
[64] Ashraf Labib,et al. An effective maintenance system using the analytic hierarchy process , 1998 .
[65] Su Wu,et al. A framework for intelligent reliability centered maintenance analysis , 2008, Reliab. Eng. Syst. Saf..
[66] Prasenjit Chatterjee,et al. Selection of materials using compromise ranking and outranking methods , 2009 .
[67] Jun Wu,et al. Selection of optimum maintenance strategies based on a fuzzy analytic hierarchy process , 2007 .
[68] N. S. Arunraj,et al. Risk-based maintenance policy selection using AHP and goal programming. , 2010 .
[69] Yung-Hsiang Cheng,et al. Rolling stock maintenance strategy selection, spares parts’ estimation, and replacements’ interval calculation , 2010 .
[70] Guido Carpinelli,et al. Exponential weighted method and a compromise programming method for multi-objective operation of plug-in vehicle aggregators in microgrids , 2014 .
[71] Alfredo Vaccaro,et al. Innovations in Power Systems Reliability , 2011 .
[72] Loon Ching Tang,et al. Fuzzy assessment of FMEA for engine systems , 2002, Reliab. Eng. Syst. Saf..
[73] Dennis C. Alexander. Application Of Monte Carlo Simulations To System Reliability Analysis , 2003 .
[74] Jean Pierre Brans,et al. HOW TO SELECT AND HOW TO RANK PROJECTS: THE PROMETHEE METHOD , 1986 .
[75] Ravi Shankar,et al. A Delphi-AHP-TOPSIS based benchmarking framework for performance improvement of a cold chain , 2011, Expert Syst. Appl..
[76] Iraklis Lazakis,et al. Integration of business and technical aspects of reliability and maintenance , 2014, ICMT 2014.
[77] Shahrul Kamaruddin,et al. Preventive replacement schedule: a case study at a processing industry , 2011 .
[78] B. Vahdani,et al. Extension of VIKOR method based on interval-valued fuzzy sets , 2010 .
[79] Adiel Teixeira de Almeida,et al. Multi-attribute risk assessment for risk ranking of natural gas pipelines , 2009, Reliab. Eng. Syst. Saf..
[80] Wei Pan,et al. Recalculation of the Critical Values for Lawshe’s Content Validity Ratio , 2012 .
[81] L. Duckstein,et al. Multicriterion Analysis for Sustainable Water Resources Planning: A Case Study in Spain , 2000 .
[82] T. E. Maddison,et al. Appropriate Risk Assessment Methods for Major Accident Establishments , 2003 .
[83] J. Neumann,et al. Theory of games and economic behavior , 1945, 100 Years of Math Milestones.
[84] Jasbir S. Arora,et al. Survey of multi-objective optimization methods for engineering , 2004 .
[85] Di Wu,et al. HAZOP Analysis-Based Method on the Risk Assessment of the Main Engine of the 10000TEU Container Ship , 2012 .
[86] Jing-Rong Li,et al. Generation of possible multiple components disassembly sequence for maintenance using a disassembly constraint graph , 2006 .
[87] Jian-Bo Yang,et al. Failure mode and effects analysis using a group-based evidential reasoning approach , 2009, Comput. Oper. Res..
[88] Balbir S. Dhillon,et al. Engineering Maintenance: A Modern Approach , 2002 .
[89] Jin Wang,et al. Formal safety assessment of fishing vessels: risk and maintenance modelling , 2004 .
[90] Y. De Smet,et al. Visual PROMETHEE: Developments of the PROMETHEE & GAIA multicriteria decision aid methods , 2009, 2009 IEEE International Conference on Industrial Engineering and Engineering Management.
[91] Liliane Pintelon,et al. Evaluating the effectiveness of maintenance strategies , 2006 .
[92] V. Ebrahimipour,et al. Multi-objective modeling for preventive maintenance scheduling in a multiple production line , 2015, J. Intell. Manuf..
[93] Faisal Khan,et al. Development of a risk-based maintenance (RBM) strategy for a power-generating plant , 2005 .
[94] Albert H.C. Tsang,et al. Preventive effect of optimal replacement policies , 2006 .
[95] Maurizio Bevilacqua,et al. A combined goal programming - AHP approach to maintenance selection problem , 2006, Reliab. Eng. Syst. Saf..
[96] Johan Springael,et al. PROMETHEE and AHP: The design of operational synergies in multicriteria analysis.: Strengthening PROMETHEE with ideas of AHP , 2004, Eur. J. Oper. Res..
[97] Ludovic-Alexandre Vidal,et al. Using a Delphi process and the Analytic Hierarchy Process (AHP) to evaluate the complexity of projects , 2011, Expert Syst. Appl..
[98] A.A.B. Dinariyana,et al. Using Sensitivity Analysis for Selecting of Ship Maintenance Variables for Improving Reliability of Military Ship , 2014 .
[99] W. D. Keyser,et al. A note on the use of PROMETHEE multicriteria methods , 1996 .
[100] Selim Zaim,et al. Maintenance strategy selection using AHP and ANP algorithms: a case study , 2012 .
[101] Noemi M. Paz,et al. Maintenance Scheduling: Issues, Results and Research Needs , 1994 .
[102] King Abdulaziz,et al. Methods for Estimating the Parameters of the Weibull Distribution , 2000 .
[103] Enrico Zio,et al. Application of delay-time analysis via Monte Carlo simulation , 2011 .
[104] Pooja Sharma,et al. Integrated framework to optimize RAM and cost decisions in a process plant , 2012 .
[105] Adiel Teixeira de Almeida,et al. A preventive maintenance decision model based on multicriteria method PROMETHEE II integrated with Bayesian approach , 2010 .
[106] Basim Al-Najjar,et al. Selecting the most efficient maintenance approach using fuzzy multiple criteria decision making , 2003 .
[107] Glenn Shafer,et al. A Mathematical Theory of Evidence , 2020, A Mathematical Theory of Evidence.
[108] Sellappan Narayanagounder,et al. A New Approach for Prioritization of Failure Modes in Design FMEA using ANOVA , 2009 .
[109] A. T. de Almeida,et al. A multi‐criteria decision‐aiding model using PROMETHEE III for preventive maintenance planning under uncertain conditions , 2007 .
[110] Francesco Zammori,et al. ANP/RPN: a multi criteria evaluation of the Risk Priority Number , 2012, Qual. Reliab. Eng. Int..
[111] O. P. Gandhi,et al. Maintenance strategy for a coal-based steam power plant equipment: A graph theoretic approach , 2004 .
[112] Kamran Rezaie,et al. Failure Mode and Effects Analysis Using Generalized Mixture Operators , 2012 .
[113] J. S. Khamba,et al. Total productive maintenance: literature review and directions , 2008 .
[114] J. S. Arendt. Using quantitative risk assessment in the chemical process industry , 1990 .
[115] Faisal Khan,et al. Techniques and methodologies for risk analysis in chemical process industries , 1998 .
[116] D. Acharya,et al. Age replacement of components during IFR delay time , 2004, IEEE Transactions on Reliability.
[117] Sheng‐Hsien Teng,et al. Failure mode and effects analysis: An integrated approach for product design and process control , 1996 .
[118] Amelia Bilbao-Terol,et al. Selecting the optimum portfolio using fuzzy compromise programming and Sharpe's single-index model , 2006, Appl. Math. Comput..
[119] Mehmet Sevkli,et al. An application of the fuzzy ELECTRE method for supplier selection , 2010 .
[120] H. Raiffa,et al. Decisions with Multiple Objectives , 1993 .
[121] A. Karyotakis,et al. On the optimisation of operation and maintenance strategies for offshore wind farms , 2011 .
[122] A. H. Christer,et al. Delay Time Models of Industrial Inspection Maintenance Problems , 1984 .
[123] Youzheng Wang,et al. CMMS Based Reliability Centered Maintenance , 2005, 2005 IEEE/PES Transmission & Distribution Conference & Exposition: Asia and Pacific.
[124] A H Christer. Modelling Inspection Policies for Building Maintenance , 1982, The Journal of the Operational Research Society.
[125] Wei Liang,et al. Reliability-centered maintenance study on key parts of reciprocating compressor , 2012, 2012 International Conference on Quality, Reliability, Risk, Maintenance, and Safety Engineering.
[126] C. H. Lawshe. A QUANTITATIVE APPROACH TO CONTENT VALIDITY , 1975 .
[127] Shahrul Kamaruddin,et al. Maintenance management decision model for preventive maintenance strategy on production equipment , 2011 .
[128] Ahmet Can Kutlu,et al. Fuzzy failure modes and effects analysis by using fuzzy TOPSIS-based fuzzy AHP , 2012, Expert Syst. Appl..
[129] Rob J. I. Basten,et al. Exploring maintenance policy selection using the Analytic Hierarchy Process; An application for naval ships , 2015, Reliab. Eng. Syst. Saf..
[130] J. B. Bowles,et al. The new SAE FMECA standard , 1998, Annual Reliability and Maintainability Symposium. 1998 Proceedings. International Symposium on Product Quality and Integrity.
[131] Reza Baradaran Kazemzadeh,et al. PROMETHEE: A comprehensive literature review on methodologies and applications , 2010, Eur. J. Oper. Res..
[132] O. G. Okogbaa,et al. Optimal preventive-replacement intervals for the Weibull life distribution: solutions and applications , 1995, Annual Reliability and Maintainability Symposium 1995 Proceedings.
[133] Iraklis Lazakis. Establishing an innovative and integrated reliability and criticality based maintenance strategy for the maritime industry , 2011 .
[134] Robert M. Conachey,et al. Development of machinery survey requirements based on reliability-centered maintenance. Discussion , 2005 .
[135] Saied Salim Beni. Implementation of Computerized Maintenance Management System in National Iranian Gas Company and sub-companies , 2014 .
[136] J. P. Modak,et al. Application of RCM to a medium scale industry , 2002, Reliab. Eng. Syst. Saf..
[137] Marcello Braglia,et al. Fuzzy TOPSIS approach for failure mode, effects and criticality analysis , 2003 .
[138] Peter Söderholm,et al. Selection of maintenance actions using the analytic hierarchy process (AHP): decision-making in railway infrastructure , 2010 .
[139] Gerald M. Knapp,et al. Determining the most important criteria in maintenance decision making , 1997 .
[140] A. K. S. Jardine,et al. Maintenance, Replacement, and Reliability , 2021 .
[141] Adiel Teixeira de Almeida,et al. Multicriteria Model for Selection of Preventive Maintenance Intervals , 2012, Qual. Reliab. Eng. Int..
[142] A. H. Christer,et al. Reducing Production Downtime Using Delay-Time Analysis , 1984 .
[143] E. Løken. Use of multicriteria decision analysis methods for energy planning problems , 2007 .
[144] Hu-Chen Liu,et al. Failure mode and effects analysis using fuzzy evidential reasoning approach and grey theory , 2011, Expert Syst. Appl..
[145] Philip A. Scarf,et al. On the application of mathematical models in maintenance , 1997 .
[146] S. M. Seyed Hosseini,et al. Reprioritization of failures in a system failure mode and effects analysis by decision making trial and evaluation laboratory technique , 2006, Reliab. Eng. Syst. Saf..
[147] Alan Wall,et al. Optimal inspection period for fishing vessel equipment : A cost and downtime model using delay Time Analysis , 2001 .
[148] R. Barlow,et al. Optimum Preventive Maintenance Policies , 1960 .
[149] Hu-Chen Liu,et al. Induced aggregation operators in the VIKOR method and its application in material selection , 2013 .
[150] A. I. Ölçer,et al. A new fuzzy multiple attributive group decision making methodology and its application to propulsion/manoeuvring system selection problem , 2005, Eur. J. Oper. Res..
[151] Marcello Braglia,et al. Monte Carlo simulation approach for a modified FMECA in a power plant , 2000 .
[152] R. V. Rao,et al. A subjective and objective integrated multiple attribute decision making method for material selection , 2010 .
[153] Hong-Zhong Huang,et al. Design FMEA for a diesel engine using two risk priority numbers , 2012, 2012 Proceedings Annual Reliability and Maintainability Symposium.
[154] P. Vincke,et al. Multicriteria analysis: survey and new directions , 1981 .
[155] Murray Turoff,et al. The Delphi Method: Techniques and Applications , 1976 .
[156] J. A. Rice,et al. Transit Vehicle Component Maintenance Policy via Multiple Criteria Decision Making Methods , 1993 .
[157] Ali Shanian,et al. TOPSIS multiple-criteria decision support analysis for material selection of metallic bipolar plates for polymer electrolyte fuel cell , 2006 .
[158] Barry Wellar,et al. Using the Delphi Technique in Normative Planning Research: Methodological Design Considerations , 2008 .
[159] David H. Gustafson,et al. Group Techniques for Program Planning: A Guide to Nominal Group and Delphi Processes , 1976 .
[160] Ludovic-Alexandre Vidal,et al. Measuring project complexity using the Analytic Hierarchy Process , 2011 .
[161] Peng Huang,et al. Stochastic Models in Reliability , 1999, Technometrics.
[162] Nan Liu,et al. Risk evaluation in failure mode and effects analysis with extended VIKOR method under fuzzy environment , 2012, Expert Syst. Appl..
[163] Shamsuddin Ahmed,et al. TPM can go beyond maintenance: excerpt from a case implementation , 2005 .
[164] James J. H. Liou,et al. Developing a hybrid multi-criteria model for selection of outsourcing providers , 2010, Expert Syst. Appl..
[165] G. Paudyal,et al. Environmental–economic decision-making in lowland irrigated agriculture using multi-criteria analysis techniques , 1999 .
[166] H. Schneider. Failure mode and effect analysis : FMEA from theory to execution , 1996 .
[167] M. Phua,et al. A GIS-based multi-criteria decision making approach to forest conservation planning at a landscape scale : a case study in the Kinabalu Area, Sabah, Malaysia , 2005 .
[168] Gwo-Hshiung Tzeng,et al. Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS , 2004, Eur. J. Oper. Res..
[169] A. Cohen,et al. Maximum Likelihood Estimation in the Weibull Distribution Based On Complete and On Censored Samples , 1965 .
[170] Hepu Deng,et al. Multicriteria analysis with fuzzy pairwise comparison , 1999, FUZZ-IEEE'99. 1999 IEEE International Fuzzy Systems. Conference Proceedings (Cat. No.99CH36315).
[171] W. Wu,et al. Comparing the aggregation methods in the analytic hierarchy process when uniform distribution , 2008 .
[172] A. Beiger. An analysis of chosen engine failures of the "Seismic research" type ships , 2011 .
[173] Nirmal Patel. A Comparative Analysis of TOPSIS & VIKOR Methods in the Selection of Industrial Robots , 2013 .
[174] P. Vincke,et al. Note-A Preference Ranking Organisation Method: The PROMETHEE Method for Multiple Criteria Decision-Making , 1985 .
[175] N Arthur. Optimization of vibration analysis inspection intervals for an offshore oil and gas water injection pumping system , 2005 .
[176] T. P. Trigo,et al. Optimization of the preventive maintenance plan of a series components system , 2006 .