Sediment-hosted base metal deposits: Project Outcomes Report.CODES/AMIRA Project P.384A.Final Report, Vol. 1, December 1998.

The Final Report for P384A is divided into three volumes: Volume 1: Summary of Outcomes Volume 2: Research results for 1998 Volume 3: Publications from AMlRA P384 (1992 to 1995) This project utilised a multidisciplinary approach incorporating geophysics, sedimentology and structure, lithogeochemistry, and physical and chemical fluid modelling. For convenience, the research programme for the original P384 project and the P384A project extension, has been run as three separate, but related, modules. As the original P384 project progressed, this distinction began to break down, resulting in the presentation of several integrated studies in the final report. This integration of research disciplines has carried over into the P384A project extension, and the studies presented here in the final report routinely overlap more than one module.