Evaluation of risk impact of completion time changes combining PSA and DSA model insight and human reliability analysis

Abstract Although in risk screening of equipment structures, systems and components, changes can be accomplished directly using RG 1.174, a plant change may also include changes to human actions. Human reliability analysis is an integral part of probabilistic safety assessment modeling. Using best estimate codes can identify unknown accident sequences as well as quantify more realistic probabilities of human error. This paper proposes a three-step approach to evaluate the risk impact of changes to completion time within nuclear power plant technical specifications, using a probabilistic safety assessment model refined by a best-estimate safety analysis and human reliability analysis. A case study is presented focusing on a completion time change of the residual heat removal system of a nuclear power plant using a level 1 low power and shutdown probabilistic safety assessment. Thus, the application case shows that the change could be accepted from a risk viewpoint, in particular, because of the risk increase imposed by extending the completion time is partially compensated by the risk decrease due to the human error probability reduction since the stress level is reduced.

[1]  P. F. Frutuoso e Melo,et al.  A critical review of methods and models for evaluating organizational factors in Human Reliability Analysis , 2014 .

[2]  R E Hall,et al.  Post-event human decision errors: operator action tree/time reliability correlation , 1982 .

[3]  Marko Čepin,et al.  Implication of PSA uncertainties on risk-informed decision making , 2011 .

[4]  Dong Hyun Lee,et al.  IMPROVEMENT OF THE LOCA PSA MODEL USING A BEST-ESTIMATE THERMAL-HYDRAULIC ANALYSIS , 2014 .

[5]  M. Sánchez-Perea,et al.  Application of the Integrated Safety Assessment methodology to safety margins. Dynamic Event Trees, Damage Domains and Risk Assessment , 2016, Reliab. Eng. Syst. Saf..

[6]  Jussi K. Vaurio Human factors, human reliability and risk assessment in license renewal of a nuclear power plant , 2009, Reliab. Eng. Syst. Saf..

[7]  A. D. Swain,et al.  Handbook of human-reliability analysis with emphasis on nuclear power plant applications. Final report , 1983 .

[8]  Slawomir Potempski,et al.  An application of the value tree analysis methodology within the integrated risk informed decision making for the nuclear facilities , 2015, Reliab. Eng. Syst. Saf..

[9]  E.M. Dougherty,et al.  Foundations for a time reliability correlation system to quantify human reliability , 1988, Conference Record for 1988 IEEE Fourth Conference on Human Factors and Power Plants,.

[10]  Michael C. Cheok,et al.  An approach for using risk assessment in risk-informed decisions on plant-specific changes to the licensing basis , 1999 .

[11]  W. E. Vesely,et al.  Handbook of methods for risk-based analysis of technical specifications , 1996 .

[12]  Andrej Prošek,et al.  Success criteria time windows of operator actions using RELAP5/MOD3.3 within human reliability analysis , 2008 .

[13]  Gary E. Wilson,et al.  Historical insights in the development of Best Estimate Plus Uncertainty safety analysis , 2013 .

[14]  Enrico Zio,et al.  A dynamic probabilistic safety margin characterization approach in support of Integrated Deterministic and Probabilistic Safety Analysis , 2016, Reliab. Eng. Syst. Saf..

[15]  Vinh N. Dang,et al.  Epistemic and aleatory uncertainties in integrated deterministic and probabilistic safety assessment: Tradeoff between accuracy and accident simulations , 2017, Reliab. Eng. Syst. Saf..

[16]  A. Introduction,et al.  AN APPROACH FOR USING PROBABILISTIC RISK ASSESSMENT IN RISK-INFORMED DECISIONS ON PLANT- SPECIFIC CHANGES TO THE LICENSING BASIS , 2009 .

[17]  Mahendra Prasad,et al.  Human error probability estimation by coupling simulator data and deterministic analysis , 2015 .

[18]  Kannan N. Iyer,et al.  Safety of nuclear power plants , 1987 .

[19]  Enrico Zio,et al.  The future of risk assessment , 2018, Reliab. Eng. Syst. Saf..

[20]  Sofía Carlos,et al.  Evaluation of risk impact of changes to surveillance requirements addressing model and parameter uncertainties , 2014, Reliab. Eng. Syst. Saf..

[21]  Sofía Carlos,et al.  Evaluation of risk impact of changes to Completion Times addressing model and parameter uncertainties , 2014, Reliab. Eng. Syst. Saf..

[22]  Sofía Carlos,et al.  An extended BEPU approach integrating probabilistic assumptions on the availability of safety systems in deterministic safety analyses , 2017, Reliab. Eng. Syst. Saf..

[23]  A. Introduction AN APPROACH FOR PLANT-SPECIFIC, RISK-INFORMED DECISIONMAKING: TECHNICAL SPECIFICATIONS , 2012 .

[24]  Stephen M. Hess Risk managed technical specifications , 2009 .

[25]  Timothy A. Wheeler,et al.  Guidance on the Treatment of Uncertainties Associated with PRAs in Risk-Informed Decision Making , 2009 .