Transmission network expansion planning considering renewable energy target with Taguchi's orthogonal array testing

[1]  G. J. Anders,et al.  Chronological Power Flow for Planning Transmission Systems Considering Intermittent Sources , 2012, IEEE Transactions on Power Systems.

[2]  Roy Billinton,et al.  Reliability modeling for evaluating the contribution of photovoltaics in electric power systems , 2011, 2011 37th IEEE Photovoltaic Specialists Conference.

[3]  Janusz Bialek,et al.  Tracing the flow of electricity , 1996 .

[4]  Y. Mishra,et al.  Long term transmission planning to meet renewable energy targets in Australia , 2012, 2012 IEEE Power and Energy Society General Meeting.

[5]  Yi Zhang,et al.  An integrated transmission planning framework for including renewable energy technologies in a deregulated power system , 2010, IEEE PES General Meeting.

[6]  Enzo Sauma,et al.  Impact of high wind power penetration on transmission network expansion planning , 2012 .

[7]  Russell Bent,et al.  Generation and Transmission Expansion Planning for Renewable Energy Integration , 2011 .

[8]  Probability Subcommittee,et al.  IEEE Reliability Test System , 1979, IEEE Transactions on Power Apparatus and Systems.

[9]  Han Yu,et al.  Robust Transmission Network Expansion Planning Method With Taguchi's Orthogonal Array Testing , 2011, IEEE Transactions on Power Systems.

[10]  Mahmut Erkut Cebeci,et al.  Transmission and substation expansion planning using Mixed Integer Programming , 2011, 2011 North American Power Symposium.

[11]  G. DeShazo,et al.  Collaborative Transmission Planning: California's Renewable Energy Transmission Initiative , 2012, IEEE Transactions on Sustainable Energy.

[12]  S.H. Hosseini,et al.  A new approach for substation expansion planning , 2006, IEEE Transactions on Power Systems.

[13]  Ahmad Zahedi Performance evaluation of wind turbine using Monte Carlo method and turbine power curve , 2012, 2012 10th International Power & Energy Conference (IPEC).

[14]  Tohid Akbari,et al.  Towards integrated planning: Simultaneous transmission and substation expansion planning , 2012 .

[15]  Ida Fuchs,et al.  Improved method for integrating renewable energy sources into the power system of Northern Europe: Transmission expansion planning for wind power integration , 2011, 2011 10th International Conference on Environment and Electrical Engineering.