Real-time freight locomotive rescheduling and uncovered train detection during disruption
暂无分享,去创建一个
[1] Ahmad I. Jarrah,et al. A Decision Support Framework for Airline Flight Cancellations and Delays , 1993, Transp. Sci..
[2] Anita Schöbel,et al. To Wait or Not to Wait - And Who Goes First? Delay Management with Priority Decisions , 2010, Transp. Sci..
[3] Keisuke Sato,et al. An Algorithm for Freight Train Driver Rescheduling in Disruption Situations , 2010 .
[4] Dennis Huisman,et al. The New Dutch Timetable: The OR Revolution , 2008, Interfaces.
[5] Denis Borenstein,et al. The vehicle rescheduling problem: Model and algorithms , 2007 .
[6] Gang Yu,et al. A Bundle Algorithm Approach for the Aircraft Schedule Recovery Problem During Hub Closures , 2003, Transp. Sci..
[7] Daniel Potthoff,et al. Disruption Management in Passenger Railway Transportation , 2007, Robust and Online Large-Scale Optimization.
[8] Ulrich Dorndorf,et al. A Branch-and-Bound Algorithm , 2002 .
[9] Martine Labbé,et al. Optimization models for the single delay management problem in public transportation , 2008, Eur. J. Oper. Res..
[10] Anita Schöbel,et al. Capacity constraints in delay management , 2009, Public Transp..
[11] Ennio Ottaviani,et al. A Traffic Management System for Real-time Traffic Optimisation in Railways , 2007 .
[12] Laurence A. Wolsey,et al. Integer and Combinatorial Optimization , 1988 .
[13] Gabor Maroti,et al. Disruption Management of Rolling Stock in Passenger Railway Transportation , 2009 .
[14] Jian Liu,et al. Real-life locomotive planning: New formulations and computational results , 2008 .
[15] Dario Pacciarelli,et al. Reordering and Local Rerouting Strategies to Manage Train Traffic in Real Time , 2008, Transp. Sci..
[16] David M. Ryan,et al. The train driver recovery problem - A set partitioning based model and solution method , 2010, Comput. Oper. Res..
[17] Norio Tomii,et al. Train Rescheduling Algorithm Which Minimizes Passengers' Dissatisfaction , 2005, IEA/AIE.
[18] Allan Larsen,et al. Disruption management in the airline industry - Concepts, models and methods , 2010, Comput. Oper. Res..
[19] Shangyao Yan,et al. Multifleet routing and multistop flight scheduling for schedule perturbation , 1997 .
[20] Jacques Desrosiers,et al. Selected Topics in Column Generation , 2002, Oper. Res..
[21] Ahmed F. Abdelghany,et al. An integrated decision support tool for airlines schedule recovery during irregular operations , 2008, Eur. J. Oper. Res..
[22] Paolo Toth,et al. Chapter 3 Passenger Railway Optimization , 2007, Transportation.
[23] Denis Borenstein,et al. The vehicle rescheduling problem: Model and algorithms , 2007, Networks.
[24] Rajan Batta,et al. A branch-and-price approach for operational aircraft maintenance routing , 2006, Eur. J. Oper. Res..
[25] Marko Bohanec,et al. Decision Support , 2008, Encyclopedia of GIS.
[26] Jan A. Persson,et al. N-tracked railway traffic re-scheduling during disturbances , 2007 .
[27] Dennis Huisman,et al. Rescheduling in passenger railways: the rolling stock rebalancing problem , 2010, J. Sched..
[28] Julie Jespersen Groth,et al. Decision Support for the Rolling Stock Dispatcher , 2009 .
[29] Dario Pacciarelli,et al. A tabu search algorithm for rerouting trains during rail operations , 2007 .
[30] Dennis Huisman,et al. A solution approach for dynamic vehicle and crew scheduling , 2004, Eur. J. Oper. Res..
[31] George L. Nemhauser,et al. Rerouting Aircraft for Airline Recovery , 2003, Transp. Sci..
[32] Marco Pranzo,et al. An Advanced Real-Time Train Dispatching System for Minimizing the Propagation of Delays in a Dispatching Area Under Severe Disturbances , 2009 .
[33] Dennis Huisman,et al. A column generation approach for the rail crew re-scheduling problem , 2007, Eur. J. Oper. Res..
[34] Ruud B.M. Huirne,et al. Integrated decision support. , 1991 .
[35] Dario Pacciarelli,et al. A branch and bound algorithm for scheduling trains in a railway network , 2007, Eur. J. Oper. Res..
[36] Balachandran Vaidyanathan,et al. The Locomotive Routing Problem , 2008, Transp. Sci..
[37] G. Maróti,et al. Maintenance Routing for Train Units: The Transition Model , 2005, Transp. Sci..
[38] Allan Larsen,et al. Airline Disruption Management - Perspectives, Experiences and Outlook , 2007 .
[39] Denis Borenstein,et al. Real-time vehicle rerouting problems with time windows , 2009, Eur. J. Oper. Res..
[40] Cameron G. Walker,et al. Simultaneous disruption recovery of a train timetable and crew roster in real time , 2005, Comput. Oper. Res..