A methodology for evaluation and monitoring of recurring hazards in underground coal mining

This study provides a methodology for evaluation and monitoring of recurring hazards in underground coal mining. An important measure in this regard may be the 'time between occurrences' (TBO) of hazards that can be modeled in the similar fashion of 'time between failures' (TBF) data modeling which is practiced in reliability study. Typically, time between accidents is modeled in safety study. This study is therefore new in two counts: (i) statistically modeling hazard occurrences based on inspection reports and (ii) monitoring of safety status based on control charting of hazard occurrences. The methodology includes Weibull-distribution based hazard rate functions, Poisson-distribution based cumulative risk functions, and Weibull-distribution based control charts. The new methodology is applied to an underground coal mining worksystem and the results are discussed. The case study results show that hazards related to machinery, ground-fall, housekeeping, roadways, and materials are more frequently occurring. It is recommended that in addition to planned inspections for identification of hazards, a control chart based hazard mitigation scheme should be employed at the mine sections for better monitoring and control of hazards.

[1]  Philip Babcock Gove,et al.  Webster's third new international dictionary of the English language, unabridged, with seven language dictionary , 1971 .

[2]  J. S. Arendt Using quantitative risk assessment in the chemical process industry , 1990 .

[3]  D. L. Simms,et al.  Normal Accidents: Living with High-Risk Technologies , 1986 .

[4]  Homayoon Dezfuli,et al.  Probabilistic Risk Assessment Procedures Guide for NASA Managers and Practitioners (Second Edition) , 2011 .

[5]  Xavier Cuny,et al.  Statistical modelling and risk assessment , 2003 .

[6]  H. G Lawley Operability Studies and Hazard Analysis , 1974 .

[7]  K. Misra Reliability Analysis and Prediction: A Methodology Oriented Treatment , 1992 .

[8]  H. H. Einstein,et al.  Assessment and management of roof fall risks in underground coal mines , 2004 .

[9]  Yueng-Hsiang Huang,et al.  The relationship between safety climate and injury rates across industries: the need to adjust for injury hazards. , 2006, Accident; analysis and prevention.

[10]  Patrick J Coleman,et al.  Measuring mining safety with injury statistics: lost workdays as indicators of risk. , 2007, Journal of safety research.

[11]  G. L. Mowrey,et al.  Blasting injuries in surface mining with emphasis on flyrock and blast area security. , 2004, Journal of Safety Research.

[12]  Hiromitsu Kumamoto,et al.  Probabilistic Risk Assessment and Management for Engineers and Scientists , 1996 .

[13]  M. C. Cullingford,et al.  Implications of probabilistic risk assessment , 1987 .

[14]  H. Martz Bayesian reliability analysis , 1982 .

[15]  Darrell Radson,et al.  Statistical analysis of injury severity rates , 1999 .

[16]  Trevor Kletz Hazop—past and future , 1997 .

[17]  James D. Bennett,et al.  Correlates of coal mine accidents and injuries: A literature review , 1984 .

[18]  Wen-Ruey Chang A statistical model to estimate the probability of slip and fall incidents , 2004 .

[19]  V. V. Kushnir,et al.  Risk: A probabilistic concept , 1985 .

[20]  J D Bennett,et al.  Multinomial logit analysis of injury severity in U.S. underground bituminous coal mines, 1975-1982. , 1984, Accident; analysis and prevention.

[21]  Tania Mol Productive Safety Management , 2003 .

[22]  Joseph G. Voelkel,et al.  Guide to Quality Control , 1982 .

[23]  Jhareswar Maiti,et al.  Evaluation of Risk of Occupational Injuries Among Underground Coal Mine Workers Through Multinomial Logit Analysis , 1999 .

[24]  Jhareswar Maiti,et al.  Severity analysis of Indian coal mine accidents – A retrospective study for 100 years , 2009 .

[25]  Gilles Dusserre,et al.  Review of 62 risk analysis methodologies of industrial plants , 2002 .

[26]  Thong Ngee Goh,et al.  Some effective control chart procedures for reliability monitoring , 2002, Reliab. Eng. Syst. Saf..

[27]  J Maiti,et al.  Risk-based maintenance--techniques and applications. , 2007, Journal of hazardous materials.

[28]  James D. Bennett,et al.  Days lost from work due to injuries in U.S. underground bituminous coal mines, 1975–1981 , 1984 .

[29]  S. Bangdiwala,et al.  Loglinear model for analysis of cross-tabulated coal mine injury data , 2001 .

[30]  Leslie T. Stayner,et al.  Modeling fatal injury rates using Poisson regression: A case study of workers in agriculture, forestry, and fishing , 1997 .

[31]  S. A. Gadd,et al.  Pitfalls in risk assessment: examples from the UK , 2004 .

[32]  G. W. Hannaman,et al.  Probabilistic risk assessment in the CPI , 1987 .

[33]  Douglas C. Montgomery,et al.  Introduction to Statistical Quality Control , 1986 .

[34]  Celal Karpuz,et al.  Accident analysis of two Turkish underground coal mines , 2004 .

[35]  David F. Montague Process risk evaluation ― What method to use? , 1990 .