Business process re-engineering to total quality management: An examination of the issues

This paper examines two research questions. First, is a re‐engineered company a suitable platform for the subsequent application of TQM principles? Second, is BPR an appropriate means to transform an organisation operating along traditional lines into one which is managed using TQM principles? It is posited that these questions have been given scant attention by the academic fraternity. Considers, for example, characteristics of BPR which facilitate or hamper TQM and also TQM considerations when reengineering. It is argued that a company can apply TQM and BPR simultaneously, thus yielding more improvements than if only one of them was used on its own. The analysis presented in the paper indicates that the application of BPR can provide the base for the subsequent development of TQM.

[1]  Varun Grover,et al.  Business process reengineering: A tutorial on the concept, evolution, method, technology and application , 1997 .

[2]  Jan Telgen Business Process Re-engineering , 1993 .

[3]  Chung Yee Lee,et al.  Business process management: survey and methodology , 1995 .

[4]  Edward A. Silver,et al.  A tutorial on business process improvement , 1997 .

[5]  Mohamed Zairi,et al.  Business process management: a boundaryless approach to modern competitiveness , 1997, Bus. Process. Manag. J..

[6]  Sanjay L. Ahire,et al.  Development and Validation of TQM Implementation Constructs , 1996 .

[7]  William J. Kettinger,et al.  Aligning BPR to Strategy: A Framework for Analysis , 1998 .

[8]  David Peel,et al.  Causes and impact of reengineering , 1998, Bus. Process. Manag. J..

[9]  Tor Guimaraes,et al.  Empirically assessing the impact of BPR on manufacturing firms , 1996 .

[10]  R. Maull,et al.  Business Process Re‐engineering , 1994 .

[11]  William J. Kettinger,et al.  BUSINESS PROCESS REENGINEERING: Building a Comprehensive Methodology , 1993 .

[12]  Michael Hammer,et al.  Reengineering Work: Don’t Automate, Obliterate , 1990 .

[13]  William J. Kettinger,et al.  Business Process Change: A Study of Methodologies, Techniques, and Tools , 1997, MIS Q..

[14]  J. Heineke,et al.  Business Process Reengineering: Improving in New Strategic Directions , 1994 .

[15]  J. Hackman,et al.  Total Quality Management: Empirical, Conceptual, and Practical Issues , 1995 .

[16]  A. Gunasekaran,et al.  Process reengineering: A review of enablers , 1997 .

[17]  M. Hammer,et al.  Reengineering the Corporation , 1993 .

[18]  B G Dale Characteristics of organizations not committed to total quality management , 1997 .

[19]  Roger G. Schroeder,et al.  A FRAMEWORK FOR QUALITY MANAGEMENT RESEARCH AND AN ASSOCIATED MEASUREMENT INSTRUMENT , 1994 .

[20]  H. J. Harrington,et al.  Total improvement management : the next generation in performance improvement , 1995 .

[21]  Ludo Gelders,et al.  From TQM to BPR: Two case studies in personnel administration , 1997 .

[22]  Thomas H. Davenport,et al.  Process Innovation: Reengineering Work Through Information Technology , 1992 .

[23]  William J. Kettinger,et al.  Pragmatic Perspectives on the Measurement of Information Systems Service Quality Analysis with LISREL : An Appendix to Pragmatic Perspectives on the Measurement of Information Systems Service Quality , 2002 .

[24]  Barrie Dale,et al.  Total quality management: origins and evolution of the term , 1998 .

[25]  William C. Miller,et al.  Synergizing total quality and innovation , 1987 .

[26]  Jayant V. Saraph,et al.  An Instrument for Measuring the Critical Factors of Quality Management , 1989 .

[27]  Stephen J. Childe,et al.  Frameworks for Understanding Business Process Re‐engineering , 1994 .

[28]  R. E. McQuater,et al.  Total quality management sustaining audit tool: Description and use , 1997 .

[29]  Gloria L. Lee,et al.  Templates for change with supply chain rationalization , 1996 .

[30]  Barrie Dale,et al.  Managing Business Improvement and Quality: Implementing Key Tools and Techniques , 1998 .