Production test IP-278-A, Supplement A verification of BPA loss bulk temperature surge at the DR-Reactor

To run a second BPA outage test at the DR-Reactor using the same instrumentation and procedure but increasing the trip-out level fro 800 MW up to a maximum of 1200 MW.