Optimum operating conditions of a multi-hammer drilling machine assessed using a linear percussion test

To minimize social cost and to avoid existing obstacles (e.g., buildings, buried pipes, rivers, and ocean), cable and electricity tunnels are constructed mainly using trenchless technology. We have developed a new method for micro-tunnel excavation using a multihammer drilling machine and identified the optimum operating conditions of the system. A linear percussion testing system was constructed to acquire rock drilling data. The tests were conducted under various air pressures and RPMs consistent with field conditions. Three classes of rock specimens in terms of strength (i.e., hard, medium, and moderate rock) were tested. The test results yielded the optimum operating conditions of the multi-hammer drilling machine according to rock strength.

[1]  Mohammad Najafi,et al.  Application of decision tree to selection of MTBM for adverse geological conditions , 2013 .

[2]  G. Giacomin,et al.  EPB tunnelling in highly variable ground – the experience of Oporto Light Metro , 2004 .

[3]  Christopher D. F. Rogers,et al.  Research needs for new construction using trenchless technologies , 2007 .

[4]  H. P. Sanio,et al.  Prediction of the performance of disc cutters in anisotropic rock , 1985 .

[5]  Sang-Ho Cho,et al.  Rock Fragmentation Assessment of a Drill Bit by Hopkinson Bar Percussion Test , 2013 .

[6]  Jin-Young Park,et al.  Optimum design of the internal flushing channel of a drill bit using RSM and CFD simulation , 2014 .

[7]  Emmanuel M Detournay,et al.  A phenomenological model for the drilling action of drag bits , 1992 .

[8]  R. K. Rowe,et al.  Geotechnical and geoenvironmental engineering handbook , 2001 .

[9]  R. Teale The concept of specific energy in rock drilling , 1965 .

[10]  J. Rostami,et al.  Disc cutting tests in Colorado Red Granite: Implications for TBM performance prediction , 2007 .

[11]  Priyan Mendis,et al.  Engineering properties of inorganic polymer concretes (IPCs) , 2007 .

[12]  W. Hustrulid,et al.  A theoretical and experimental study of the percussive drilling of rock part I—theory of percussive drilling , 1971 .

[13]  Yong-Joo Lee,et al.  Causes of reduction in shield TBM performance – A case study in Seoul , 2011 .

[14]  P. Bowen,et al.  Changes in portlandite morphology with solvent composition: Atomistic simulations and experiment , 2011 .

[15]  R. A. Snowdon,et al.  A study of disc cutting in selected British rocks , 1982 .

[16]  Qiuming Gong,et al.  Tunnelling through a frequently changing and mixed ground : a case history in Singapore , 2007 .

[17]  Carl T. Haas,et al.  Decision Tool for Microtunneling Method Selection , 1999 .

[18]  Yanjun Shang,et al.  A case history of Tunnel Boring Machine jamming in an inter-layer shear zone at the Yellow River Diversion Project in China , 2004 .

[19]  Jaewook Lee,et al.  Evaluation of drilling efficiency by percussion testing of a drill bit with new button arrangement , 2014 .

[20]  Mohammad Najafi,et al.  Development and applications of trenchless technology in China , 2008 .

[21]  Emmanuel M Detournay,et al.  Bit/rock interface laws in directional drilling , 2012 .

[22]  H. Copur,et al.  Dominant rock properties affecting the performance of conical picks and the comparison of some experimental and theoretical results , 2006 .

[23]  Soo-Ho Chang,et al.  Evaluation of cutting efficiency during TBM disc cutter excavation within a Korean granitic rock using linear-cutting-machine testing and photogrammetric measurement , 2013 .

[24]  Jingang Yi,et al.  Modeling of pure percussive drilling for autonomous robotic bridge decks rehabilitation , 2013, 2013 IEEE International Conference on Automation Science and Engineering (CASE).

[25]  Peter Rumsey,et al.  TRENCHLESS TECHNOLOGY APPLICATIONS FOR UTILITY INSTALLATION , 1997 .

[26]  Soo-Ho Chang,et al.  Optimum spacing of TBM disc cutters: A numerical simulation using the three-dimensional dynamic fracturing method , 2010 .