Computer-assisted multi-item, muti-machine and multi-site scheduling in a hardwood flooring factory

Within this paper, we consider the problem of supporting the scheduling of a set of lumber drying kilns as to meet the demand generated by the production plan of a hardwood factory, while avoiding stockouts. The computer-based coordination of the kiln-drying activities within the global hardwood flooring production process is first presented. Then, we focus on the kiln drying activities and develop a heuristic to schedule kilns in a multi-item, multi-machine and multi-site production environment, with the objective of keeping inventories low while meeting demand and avoiding stockouts. An overview of KilnOpt, an object-oriented software environment to implement the scheduling heuristic is presented in the last section of the paper.

[1]  G. Gallego Scheduling the production of several items with random demands in a single facility , 1990 .

[2]  R. W. Haessler An Improved Extended Basic Period Procedure for Solving the Economic Lot Scheduling Problem , 1979 .

[3]  S. Elmaghraby The Economic Lot Scheduling Problem (ELSP): Review and Extensions , 1978 .

[4]  Graham K. Rand,et al.  Decision Systems for Inventory Management and Production Planning , 1979 .

[5]  Louis Cloutier,et al.  An agent-driven approach to design factory information systems , 1996 .

[6]  Paul H. Zipkin Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem , 1991, Oper. Res..

[7]  Kyung S. Park,et al.  A Stepwise partial enumeration algorithm for the economic lot scheduling problem , 1984 .

[8]  Roger C. Vergin,et al.  Scheduling Rules For The Multiple Product Single Machine System With Stochastic Demand , 1978 .

[9]  Robert C. Leachman,et al.  A note on improving the performance of the enhanced dynamic cycte lengths heuristic for the multi-item, single machine scheduling problem , 1995 .

[10]  André Gascon The Lookahead Heuristic For Multi-Item Single Machine Production Scheduling With Dynamic, Stochastic Demands , 1988 .

[11]  S. Graves The Multi-Product Production Cycling Problem , 1980 .

[12]  V. Sridharan,et al.  A hierarchical approach for capacity coordination in multiple products single-machine production systems with stationary stochastic demands , 1995 .

[13]  Robert C. Leachman,et al.  A Heuristic scheduling policy for multi-item, single-machine production systems with time-varying, stochastic demands , 1988 .

[14]  Robert C. Leachman,et al.  Multi-item, single-machine scheduling problem with stochastic demands: a comparison of heuristics , 1994 .

[15]  Samuel G. Davis Scheduling Economic Lot Size Production Runs , 1990 .

[16]  Robert C. Leachman,et al.  Note: An Improvement to the Dynamic Cycle Lengths Heuristic for Scheduling the Multi-Item, Single-Machine , 1991 .