Implications from major accident causation theories to activity-related risk analysis

Abstract Operational Planning Decisions, which are characterized by short planning time and high frequency in the operational phase, has received little attention in risk and safety research in oil and gas industry. Activity performance risk, as an important part of the input to such decisions, must reflect explicitly the critical factors (Safety Critical Parameters) that determine the risk level involved in the activity. The paper looks into major accident theories that are relevant for the operational phase to find key concepts and implications for activity performance risk analysis. A generic list of Safety Critical Parameters is developed to assist managing both identified and unidentified risk in the activity. The main conclusion is that the different theories are not conflicting but supplementing to get the list that covers the most important factors in a broad sense. This list provides a guide to Operational Planning Decision makers to collect systematically activity-related risk information to ensure a safe activity.

[1]  B. Turner Man Made Disasters , 1995 .

[2]  Nancy G. Leveson,et al.  Engineering a Safer World: Systems Thinking Applied to Safety , 2012 .

[3]  David Woods,et al.  Resilience Engineering: Concepts and Precepts , 2006 .

[4]  Karl E. Weick,et al.  Managing the unexpected: resilient performance in an age of uncertainty, second edition , 2007 .

[5]  Andrew Hale Special Issue on Process Safety Indicators , 2009 .

[6]  Jan Erik Vinnem,et al.  Decisions and decision support for major accident prevention in the process industries , 2015 .

[7]  Xue Yang,et al.  Risk information for operational decision-making in the offshore oil and gas industry , 2016 .

[8]  David John,et al.  Development of risk‐based process safety indicators , 2009 .

[9]  Nancy G. Leveson,et al.  A new accident model for engineering safer systems , 2004 .

[10]  K. Roberts Some Characteristics of One Type of High Reliability Organization , 1990 .

[11]  Snorre Sklet,et al.  Evaluation of the Risk OMT model for maintenance work on major offshore process equipment , 2012 .

[12]  T. L. Porte High Reliability Organizations: Unlikely, Demanding and At Risk , 1996 .

[13]  Stein Haugen,et al.  Risk information for operational decision making in oil and gas operations , 2015 .

[14]  B. Turner Causes of Disaster: Sloppy Management , 1994 .

[15]  Ingrid Bouwer Utne,et al.  Building Safety indicators: Part 2 - Application, practices and results , 2011 .

[16]  T Kippenberger Man‐made disasters: the failure of foresight , 1999 .

[17]  J. Reason Human error: models and management , 2000, BMJ : British Medical Journal.

[18]  A. Hopkins Issues in safety science , 2014 .

[19]  Jon Espen Skogdalen,et al.  Developing safety indicators for preventing offshore oil and gas deepwater drilling blowouts , 2011 .

[20]  Snorre Sklet,et al.  Hydrocarbon releases on oil and gas production platforms: Release scenarios and safety barriers , 2006 .

[21]  D. L. Simms,et al.  Normal Accidents: Living with High-Risk Technologies , 1986 .

[22]  Snorre Sklet,et al.  Barrier and operational risk analysis of hydrocarbon releases (BORA-Release). Part I. Method description. , 2006, Journal of hazardous materials.

[23]  Andrew Hopkins The Problem of Defining High Reliability Organisations , 2007 .

[24]  T. Laporte,et al.  Working in Practice But Not in Theory: Theoretical Challenges of “High-Reliability Organizations” , 1991 .

[25]  Carl Rollenhagen,et al.  Event investigations at nuclear power plants in Sweden: Reflections about a method and some associated practices , 2011 .

[26]  James T. Reason,et al.  Managing the risks of organizational accidents , 1997 .

[27]  Petter Grytten Almklov,et al.  Organisational safety indicators: Some conceptual considerations and a supplementary qualitative approach , 2010 .

[28]  Ioannis A. Papazoglou,et al.  Modeling accidents for prioritizing prevention , 2007, Reliab. Eng. Syst. Saf..

[29]  Xue Yang,et al.  Classification of risk to support decision-making in hazardous processes , 2015 .

[30]  Charles Perrow,et al.  The Next Catastrophe: Reducing Our Vulnerabilities to Natural, Industrial, and Terrorist Disasters , 2007 .

[31]  Andrew Hopkins,et al.  The limits of normal accident theory , 1999 .

[32]  Erik Hollnagel,et al.  Resilience Engineering in Practice: A Guidebook , 2012 .

[33]  Snorre Sklet,et al.  Safety barriers: Definition, classification, and performance , 2006 .

[34]  Karl E. Weick,et al.  Managing the unexpected: Assuring high performance in an age of complexity. , 2001 .

[35]  Ben J. M. Ale More thinking about process safety indicators , 2009 .

[36]  Urban Kjellen,et al.  Prevention of accidents through experience feedback , 2000 .

[37]  Ron Westrum,et al.  A Typology of Resilience Situations , 2017 .

[38]  Sidney Dekker,et al.  Drift into Failure: From Hunting Broken Components to Understanding Complex Systems , 2011 .

[39]  Genserik Reniers,et al.  Process safety indicators, a review of literature , 2016 .

[40]  N. Pidgeon,et al.  Man-made disasters: Why technology and organizations (sometimes) fail. , 2000 .

[41]  Snorre Sklet,et al.  Barrier and operational risk analysis of hydrocarbon releases (BORA-Release). Part II: Results from a case study. , 2006, Journal of hazardous materials.

[42]  Jens Rasmussen,et al.  Risk management in a dynamic society: a modelling problem , 1997 .

[43]  Jan Erik Vinnem,et al.  Norwegian Oil and Gas Industry Project to Reduce the Number of Hydrocarbon Leaks with emphasis on Operational Barriers Improvement , 2013 .

[44]  Stein Haugen,et al.  Factors in offshore planning that affect the risk for major accidents , 2015 .

[45]  Barry Kirwan,et al.  A Guide to Practical Human Reliability Assessment , 1994 .

[46]  Hans J. Pasman,et al.  The safety barometer: How safe is my plant today? Is instantaneously measuring safety level utopia or realizable? , 2013 .

[47]  Jan Erik Vinnem,et al.  Risk modelling of maintenance work on major process equipment on offshore petroleum installations , 2012 .