A Bayesian method for multi-pollution source water quality model and seasonal water quality management in river segments

Abstract Excessive pollutant discharge from multi-pollution resources can lead to a rise in downriver contaminant concentration in river segments. A multi-pollution source water quality model (MPSWQM) was integrated with Bayesian statistics to develop a robust method for supporting load ( I ) reduction and effective water quality management in the Harbin City Reach of the Songhua River system in northeastern China. The monthly water quality data observed during the period 2005–2010 was analyzed and compared, using ammonia as the study variable. The decay rate ( k ) was considered a key factor in the MPSWQM, and the distribution curve of k was estimated for the whole year. The distribution curves indicated small differences between the marginal distribution of k of each period and that water quality management strategies can be designed seasonally. From the curves, decision makers could pick up key posterior values of k in each month to attain the water quality goal at any specified time. Such flexibility is an effective way to improve the robustness of water quality management. For understanding the potential collinearity of k and I , a sensitivity test of k for I 2i (loadings in segment 2 of the study river) was done under certain water quality goals. It indicated that the posterior distributions of I 2i show seasonal variation and are sensitive to the marginal posteriors of k . Thus, the seasonal posteriors of k were selected according to the marginal distributions and used to estimate I 2i in next water quality management. All kinds of pollutant sources, including polluted branches, point and non-point source, can be identified for multiple scenarios. The analysis enables decision makers to assess the influence of each loading and how best to manage water quality targets in each period. Decision makers can also visualize potential load reductions under different water quality goals. The results show that the proposed method is robust for management of multi-pollutant loadings under different water quality goals to help ensure that the water quality of river segments meets targeted goals.

[1]  S. P. Neuman,et al.  Bayesian analysis of data-worth considering model and parameter uncertainties , 2012 .

[2]  Michael Rode,et al.  New challenges in integrated water quality modelling , 2010 .

[3]  Gareth Pender,et al.  Field Measurements and Flow Modeling of Overbank Flows in River Severn, U.K. , 2003 .

[4]  Bing Chen,et al.  An Interval-Parameter Waste-Load-Allocation Model for River Water Quality Management Under Uncertainty , 2009, Environmental management.

[5]  D. Rubin,et al.  Inference from Iterative Simulation Using Multiple Sequences , 1992 .

[6]  George Kuczera,et al.  Critical evaluation of parameter consistency and predictive uncertainty in hydrological modeling: A case study using Bayesian total error analysis , 2009 .

[7]  Bradley P. Carlin,et al.  Bayesian measures of model complexity and fit , 2002 .

[8]  Gordon H. Huang,et al.  Two-stage planning for sustainable water-quality management under uncertainty. , 2009, Journal of environmental management.

[9]  Mark E. Borsuk,et al.  Approaches to Evaluate Water Quality Model Parameter Uncertainty for Adaptive TMDL Implementation1 , 2007 .

[10]  Ricardo Ortega,et al.  Use of environmental sensors and sensor networks to develop water and salinity budgets for seasonal wetland real-time water quality management , 2010, Environ. Model. Softw..

[11]  Arnold W. Heemink,et al.  Inverse modeling of groundwater flow using model reduction , 2005 .

[12]  Mark E. Borsuk,et al.  On Monte Carlo methods for Bayesian inference , 2003 .

[13]  John E McCray,et al.  Estimating biozone hydraulic conductivity in wastewater soil-infiltration systems using inverse numerical modeling. , 2007, Water research.

[14]  Michael Dowd,et al.  A Bayesian approach to the ecosystem inverse problem , 2003 .

[15]  Dingjiang Chen,et al.  Combined inverse modeling approach and load duration curve method for variable nitrogen total maximum daily load development in an agricultural watershed , 2011, Environmental science and pollution research international.

[16]  Ashish Sharma,et al.  Hydrological model selection: A Bayesian alternative , 2005 .

[17]  Dingjiang Chen,et al.  A Bayesian approach for calculating variable total maximum daily loads and uncertainty assessment. , 2012, The Science of the total environment.

[18]  A. K. Rastogi,et al.  Development of numerical model for inverse modeling of confined aquifer: Application of simulated annealing method , 2006 .

[19]  Huaicheng Guo,et al.  Water quality modeling for load reduction under uncertainty: a Bayesian approach. , 2008, Water research.

[20]  Rui Zou,et al.  An adaptive neural network embedded genetic algorithm approach for inverse water quality modeling , 2007 .

[21]  Jian Shen,et al.  Inverse estimation of nonpoint sources of fecal coliform for establishing allowable load for Wye River, Maryland. , 2006, Water research.

[22]  A. Kuo,et al.  Application of Inverse Method to Calibrate Estuarine Eutrophication Model , 1998 .

[23]  Zhenxing Zhang,et al.  An Optimization Method Based on Scenario Analysis for Watershed Management Under Uncertainty , 2007, Environmental management.

[24]  Tyler Smith,et al.  Development of a formal likelihood function for improved Bayesian inference of ephemeral catchments , 2010 .

[25]  Gabriele Freni,et al.  Bayesian approach for uncertainty quantification in water quality modelling: The influence of prior distribution , 2010 .

[26]  Gregory E Schwarz,et al.  Incorporating Uncertainty Into the Ranking of SPARROW Model Nutrient Yields From Mississippi/Atchafalaya River Basin Watersheds1 , 2009, Journal of the American Water Resources Association.

[27]  A. Patil,et al.  Bayesian approach to estimating margin of safety for total maximum daily load development. , 2011, Journal of environmental management.

[28]  B. R. Faulkner,et al.  Bayesian modeling of the assimilative capacity component of nutrient total maximum daily loads , 2008 .

[29]  P. Kitanidis,et al.  A method for enforcing parameter nonnegativity in Bayesian inverse problems with an application to contaminant source identification , 2003 .

[30]  Motahareh Saadatpour,et al.  Waste load allocation modeling with fuzzy goals; simulation-optimization approach , 2007 .

[31]  John M. Melack,et al.  Longitudinal assessment of the effect of concentration on stream N uptake rates in an urbanizing watershed , 2010 .

[32]  P. Kitanidis,et al.  Estimation of historical groundwater contaminant distribution using the adjoint state method applied to geostatistical inverse modeling , 2004 .

[33]  Jian Shen,et al.  Combined Bayesian statistics and load duration curve method for bacteria nonpoint source loading estimation. , 2010, Water research.

[34]  T. Ulrych,et al.  A full‐Bayesian approach to the groundwater inverse problem for steady state flow , 2000 .

[35]  Ibrahim Alameddine,et al.  A Bayesian changepoint-threshold model to examine the effect of TMDL implementation on the flow-nitrogen concentration relationship in the Neuse River basin. , 2011, Water research.

[36]  Ashish Sharma,et al.  A comparative study of Markov chain Monte Carlo methods for conceptual rainfall‐runoff modeling , 2004 .

[37]  Gregory E. Schwarz,et al.  Effect of stream channel size on the delivery of nitrogen to the Gulf of Mexico , 2000, Nature.

[38]  P. P. Mujumdar,et al.  A fuzzy risk approach for seasonal water quality management of a river system , 2002 .

[39]  S. Chapra Surface Water-Quality Modeling , 1996 .

[40]  J. Vrugt,et al.  A formal likelihood function for parameter and predictive inference of hydrologic models with correlated, heteroscedastic, and non‐Gaussian errors , 2010 .

[41]  U. Aswathanarayana,et al.  Assessing the TMDL Approach to Water Quality Management , 2001 .