Collective efficacy and manufacturing schedule instability: a study in Hong Kong and the Pearl River Delta region

Schedule instability has been a major problem in the manufacturing industries. This study is to investigate how the various influencing factors affect the schedule instability experienced by manufacturing companies. A research framework is developed by hypothesising the effect of the key factors (relationships with the supplier and customers, and internal operation) on schedule instability and the correlation between collective efficacy on performance and schedule instability. The results obtained indicate that the internal operations of manufacturing companies and relationships with customers have significant impacts on the degree of collective efficacy perceived, while internal operations are significantly correlated to customer relationships.

[1]  Thomas Jensen,et al.  Measuring and improving planning stability of reorder-point lot-sizing policies , 1993 .

[2]  Alf Kimms,et al.  Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling, and lot sizing , 1998 .

[3]  Sita Bhaskaran Simulation Analysis of a Manufacturing Supply Chain , 1998 .

[4]  Rakesh Nagi,et al.  New lot-sizing formulations for less nervous production schedules , 2000, Comput. Oper. Res..

[5]  Jerry C. Wei,et al.  Responding to schedule changes in build‐to‐order supply chains , 2005 .

[6]  van Kh Karel Donselaar,et al.  The impact of material coordination concepts on planning stability in supply chains , 2000 .

[7]  V. Sridharan,et al.  On Using Buffer Stock to Combat Schedule Instability , 1990 .

[8]  Dean H. Kropp,et al.  A comparison of strategies to dampen nervousness in MRP systems , 1986 .

[9]  V. Sridharan,et al.  Alternative approaches for reducing schedule instability in multistage manufacturing under demand uncertainty , 1995 .

[10]  Gerald Heisig,et al.  Comparison of (s,S) and (s,nQ) inventory control rules with respect to planning stability , 2001 .

[11]  Dean H. Kropp,et al.  MRP system nervousness: Causes and cures , 1985 .

[12]  Jinxing Xie,et al.  Impact of forecasting error on the performance of capacitated multi-item production systems , 2004, Comput. Ind. Eng..

[13]  John N. Pearson,et al.  Strategically managed buyer–supplier relationships and performance outcomes , 1999 .

[14]  V. Sridharan,et al.  The impact of safety stock on schedule instability, cost and service , 1989 .

[15]  L. Ellram A Managerial Guideline for the Development and Implementation of Purchasing Partnerships , 1991 .

[16]  Qiyuan Jiang,et al.  LOT-SIZING RULE AND FREEZING THE MASTER PRODUCTION SCHEDULE UNDER CAPACITY CONSTRAINT AND DETERMINISTIC DEMAND , 2009 .

[17]  Robert H. Storer,et al.  Manufacturing logistics research: taxonomy and directions , 1999 .

[18]  Xiande Zhao,et al.  Freezing the master production schedule for material requirements planning systems under demand uncertainty , 1993 .

[19]  Robert R. Inman,et al.  The causes of schedule instability in an automotive supply chain , 1997 .

[20]  Xiande Zhao,et al.  Lot-sizing rules and freezing the master production schedule in material requirements planning systems under demand uncertainty , 1995 .

[21]  Jinxing Xie,et al.  Freezing the master production schedule under single resource constraint and demand uncertainty , 2003 .

[22]  Joseph W.K. Chan,et al.  Competitive strategies and manufacturing logistics: An empirical study of Hong Kong manufacturers , 2005 .

[23]  Botond Kádár,et al.  Stability-oriented evaluation of rescheduling strategies, by using simulation , 2007, Comput. Ind..

[24]  I Nyoman Pujawan,et al.  Schedule nervousness in a manufacturing system: a case study , 2004 .

[25]  Henry L. Tosi A Theory of Goal Setting and Task Performance , 1991 .

[26]  Edwin A. Locke,et al.  Effects of Leader Role, Team-Set Goal Difficulty, Efficacy, and Tactics on Team Effectiveness , 1997 .

[27]  Peter Kelle,et al.  Transition to just‐in‐time purchasing , 1998 .

[28]  Gregory E. Prussia,et al.  A motivational investigation of group effectiveness using social-cognitive theory. , 1996 .

[29]  Kok de Ag,et al.  Nervousness in inventory management : comparison of basic control rules , 1997 .

[30]  V. Hinsz,et al.  Using Judgmental Anchors to Establish Challenging Self-Set Goals Without Jeopardizing Commitment , 1997 .

[31]  Kamil Erkan Kabak,et al.  An improved metric for measuring multi-item multi-level schedule instability under rolling schedules , 2009, Comput. Ind. Eng..