경량전철 시스템엔지니어링 비용추정 및 제도개선방안 연구
暂无分享,去创建一个
The system engineering cost was applied at the 5% of the system construction cost of the “A Study on General Guidelines for Pre-feasibility Study (5th Edition)”as extra expense in order to achieve the reduction effect of technical risk and cost of domestic Light Rail Transit(LRT) construction project However, Because The system engineering cost is needed to establish objective basis because of uncertain basis of calculation, detailed work, standard. In this paper, We will analyze the situation and problem of the existing domestic LRT SE business expense, and will study the objective criteria and systematic improvements plans of the economical and reasonable system engineering cost throughout the manufacturing cost analysis by the business procedures from ISO/IEC life-cycle process viewpoint